My WebLink
|
Help
|
About
|
Sign Out
PC-2025-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 10:30:44 AM
Creation date
12/23/2025 10:28:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/23/2025
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hana Japan Restaurant Project <br />Initial Study/Mitigated Negative Declaration <br />54 <br />May 2025 <br />areas and tree openings. Silva cells are landscaping areas with lightly compacted soil <br />intended to grow large trees and treat stormwater on location. The collected stormwater <br />would be treated by filtering runoff through an active layer of soil to remove pollutants. The <br />proposed project would include six-inch storm drainage pipes to convey the treated <br />stormwater to the existing City system. <br /> <br />Each bio-retention area would be sized to adequately handle all runoff from the proposed <br />impervious surfaces within the project site. Thus, the proposed project would comply with <br />the requirements of the SWRCB and the Regional Water Quality Control Board (RWQCB) <br />and would meet C.3 Standards related to stormwater treatment. During operation, the <br />project would comply with all relevant water quality standards and waste discharge <br />requirements, and would not degrade water quality. <br /> <br />Conclusion <br />Based on the above, the proposed project would not result in the violation of water quality <br />standards or waste discharge requirements, alter the drainage pattern of the site resulting <br />in erosion or siltation, increase the rate or amount of surface runoff in a manner which <br />would result in flooding on- or off-site, contribute runoff water which would exceed the <br />capacity of existing or planned stormwater drainage systems, or otherwise degrade water <br />quality during construction and operation. Therefore, a less-than-significant impact <br />would occur. <br /> <br />b,e. Water supplies in the City of Pleasanton are provided by the City using water purchased <br />from Zone 7 of the Alameda County Flood Control and Water Conservation District (Zone <br />7 Water Agency). The City owns and operates three active groundwater wells and a water <br />distribution, pumping, and storage system divided into a number of water pressure zones. <br />Pursuant to the Zone 7 Water Agency’s 2023 Annual Consumer Confidence Report, the <br />majority of the water supply originates as Sierra Nevada snowmelt and is conveyed <br />through the Delta and then by the South Bay Aqueduct.32 Other water supply sources <br />include surface water from rain runoff stored in Lake Del Valle and groundwater pumped <br />from the aquifer underlying the Livermore-Amador Valley. Typically, the Zone 7 Water <br />Agency’s water supply is comprised of approximately 60 to 80 percent surface water and <br />20 to 40 percent groundwater each year. The amount of each type of source water varies <br />depending on precipitation, location, and other conditions. In 2023, the Zone 7 Water <br />Agency delivered approximately 95 percent treated surface water and five percent <br />groundwater, allowing the groundwater basin to recharge after years of drought. <br /> <br />Bulletin 118 – Interim Update 2016 defines 517 groundwater basins and subbasins in <br />California. Pursuant to the Sustainable Groundwater Management Act (SGMA), the <br />Department of Water Resources (DWR) is required to prioritize the 517 groundwater <br />basins and subbasins as either High, Medium, Low, or Very Low. Prioritization is based <br />on the following considerations: <br /> <br />• The population overlying the basin or subbasin; <br />• The rate of current and projected growth of the population overlying the basin or <br />subbasin; <br />• The number of public supply wells that draw from the basin or subbasin; <br />• The total number of wells that draw from the basin or subbasin; <br /> <br />32 Zone 7 Water Agency. 2023 Annual Consumer Confidence Report. Available at: <br />https://www.zone7water.com/post/annual-water-quality-reports. Accessed September 2024.
The URL can be used to link to this page
Your browser does not support the video tag.