Laserfiche WebLink
Hana Japan Restaurant Project <br />Initial Study/Mitigated Negative Declaration <br />71 <br />May 2025 <br />project; and the project would not conflict with any existing or planned pedestrian facilities <br />in the project vicinity. A less-than-significant impact related to pedestrian facilities would <br />occur. <br /> <br />Bicycle Facilities <br />According to the Pleasanton Trails Master Plan,42 the existing bicycle network includes <br />approximately 80 miles of trails and routes throughout the City, including Class I paved <br />trails, bicycle lanes, and bicycle routes. In the project vicinity, existing Class II bicycle lanes <br />are located along Dublin Canyon Road, north of the proposed project site. Thus, adequate <br />bicycle facilities would be available to serve the proposed project; and the project would <br />not conflict with any existing or planned bicycle facilities in the project vicinity. A less-than- <br />significant impact related to bicycle facilities would occur. <br /> <br />Public Transit Impacts <br />The City’s connections to regional transit options include Bay Area Rapid Transit (BART), <br />Altamont Corridor Express (ACE) trains, and the BART express bus service (including <br />connections between the Walnut Creek BART Station and the Pleasanton/Dublin BART <br />station). Local public transit services in the City are provided by the Livermore Amador <br />Valley Transit Authority (LAVTA) through the WHEELS and the ACE service. In addition, <br />the City currently maintains a Dial-A-Bus (paratransit) service for senior and disabled <br />residents on weekdays. The closest bus stop to the proposed project site is the Stoneridge <br />Mall bus stop, located approximately 0.32-mile east of the project site. <br /> <br />The City also promotes an internal employee trip reduction program by providing <br />incentives for City employees to use a commute alternative, such as riding public transit, <br />carpooling, walking or biking. Pursuant to Chapter 3.26 of the City’s Municipal Code, upon <br />issuance of a building permit, the proposed project would be subject to a transportation <br />development fee. Payment of the fee would help fund any transportation improvements <br />deemed necessary by the City and help further reduce any impacts related to transit <br />facilities. Overall, because the project site is located within close proximity to existing <br />transit facilities and would be subject to a fair-share payment to support future <br />transportation improvements, a less-than-significant impact would occur. <br /> <br />Conclusion <br />Based on the above, the proposed project would not conflict with any existing or proposed <br />roadway, pedestrian, bicycle, or transit facilities, or conflict with an applicable plan, <br />ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, <br />and pedestrian facilities and, a less-than-significant impact would occur. <br /> <br />b. Section 15064.3 of the CEQA Guidelines provides specific considerations for evaluating <br />a project’s transportation impacts. Pursuant to Section 15064.3, analysis of VMT <br />attributable to a project is the most appropriate measure of transportation impacts. Other <br />relevant considerations may include the effects of the project on transit and non-motorized <br />travel. The City of Pleasanton has not yet established any standards or thresholds <br />regarding VMT; however, LCI released a Technical Advisory to evaluate transportation <br />impacts pursuant to CEQA, which includes screening thresholds that can be applied to a <br />project to determine whether that project can be presumed to cause a less-than- <br />significant amount of VMT, in which case the project could be screened out of doing further <br /> <br />42 City of Pleasanton. Pleasanton Trails Master Plan. [pg. 31] May 7, 2019.