Laserfiche WebLink
<br />Page 23 <br /> <br />79. EMERGENCY VEHICLE ACCESS ROADS: Access roads shall have 13 feet, 6 inches <br />unobstructed vertical clearance, 20 feet of unobstructed width (26 feet where occupied <br />building floors exceed 30 feet height), and inside turning radius of 31 feet and outside <br />turning radius of 51 feet. Unobstructed shall mean a clear travel way, excluding <br />parking width, and designed for an emergency vehicle weight of 70,000 pounds under <br />all weather conditions. Unobstructed width shall not include the width of rolled curbs, <br />sidewalks, or non-drivable surfaces. All exterior portions of buildings must be within <br />200 feet of an access road. Yard and parking area may be able to be located farther <br />than 200 feet from access roads, depending on the specific use. <br /> <br />80. PREMISES IDENTIFICATION: Address numbers shall be installed on the front or <br />primary entrance for all buildings. Minimum building address character size shall be <br />12-inch high by 1-inch stroke. In all cases address numerals shall be of contrasting <br />background and clearly visible in accordance with the Livermore-Pleasanton Fire <br />Department Premises Identification Standards. This may warrant field verification and <br />adjustments based upon topography, landscaping or other obstructions. <br /> <br />81. RESIDENTIAL – NEW CONSTRUCTION: The following items shall be provided prior <br />to any construction above the foundation or slab. <br /> <br />a. Emergency vehicle access shall be provided to the site (tract), including areas <br />where construction is occurring. <br />b. Designated construction material storage and construction worker parking shall <br />not obstruct the emergency vehicle access route(s). <br />c. On-site fire hydrants shall be in service. Fire hydrants shall be flushed and all <br />valves open. <br /> <br />82. FINAL INSPECTION: Prior to request for final inspection, all access roads, on-site <br />access and fire hydrants shall be provided. All fire hydrants shall be accepted, <br />inspected and tested to applicable City Standards. <br /> <br />ENGINEERING DIVISION <br /> <br />Project Specific Conditions of Approval <br />83. CONDITIONS OF APPROVAL. These Conditions of Approval shall be depicted on a <br />plan sheet(s) in the submitted plans for construction. (Address this condition prior to <br />plan approval) <br /> <br />84. ENGINEERING DIVISION FEES FOR SERVICE. The Engineering Division assesses <br />fees for services including plan-check, permit issuance, and inspection according to <br />the City’s adopted Master Fee Schedule. These fees are separate and distinct from <br />fees assessed by the Community Development Department (including Planning and <br />Building Division fees). The applicant is responsible for payment of all Engineering <br />Division fees prior to services rendered or permit issuance, whichever is first. (Address <br />this condition prior to plan approval) <br />Docusign Envelope ID: 52DE2131-F0C9-4C18-86DD-6B9E7ADA8792