Laserfiche WebLink
<br />Page 24 <br /> <br />85. TITLE ISSUES. Referring to the CLTA Preliminary Report by First American Title <br />Company, the applicant shall address the following title questions (address the <br />following conditions prior to map approval): <br /> <br />a. Exception 6 discusses a Pacific Bell easement for Communications Equipment <br />recorded on 11-13-2019 as Instrument No. 2019-231843. General Note 4 on <br />Sheet 3 of the CBG plans suggests that this easement will be <br />“removed/quitclaimed”. Evidence that AT&T (formerly Pacific Bell) is willing to <br />quitclaim their easement rights has been provided. Once the quitclaim deed is <br />recorded with Alameda County, provide the quitclaim deed and reference on <br />the map. <br /> <br />86. PUBLIC SERVICE EASEMENT. A 10-foot wide Public Service Easement (PSE) shall <br />be granted to the City across the Black Avenue frontage of the property and all other <br />areas where public infrastructure is installed in accordance with Pleasanton Municipal <br />Code §19.24.190 and 19.36.110. PSEs shall be offered as an easement for public <br />purposes including but not limited to installation, construction, access, and <br />maintenance of all public services facilities above and below the ground surface <br />including poles, wires, conduits, vaults, cabinets, sanitary sewers, storm drains, gas <br />lines, and water lines as well as all those public utilities and appurtenances thereto as <br />subject to regulation under Pleasanton Municipal Code Chapter 13.04. Consistent with <br />California Government Code Section 66439(d)(3), the offer shall include the <br />statement, “The real property described below is dedicated as an easement for public <br />purposes…” <br /> (Address this condition prior to map approval). <br /> <br />87. HORIZONTAL SETBACK FROM OVERHEAD ELECTRICAL LINES. Pacific Gas & <br />Electric Company (PG&E) operate joint utility poles and overhead electrical lines <br />along the Black Avenue frontage of the property. PG&E requires a safe working <br />clearance from active overhead lines depending on the nominal line-voltage of the <br />suspended wires. Because the proposed height of the building will place the northern <br />exterior walls in close proximity to the electrical lines, the applicant shall determine the <br />required setback from the suspended wires. A PG&E letter confirming the setback is <br />required to be submitted to the City. If the required setback from PG&E overhead line <br />is not achieved, the applicant shall either adjust the locations of the buildings to <br />achieve compliance, or shall place said joint utility pole facilities underground. <br />(Address this condition prior to plan approval). <br /> <br />88. SANITARY SEWER NETWORK. Capacity in the City’s sanitary sewer network to <br />serve the subject development must be verified by running a scenario in the City’s <br />network computer model. The computer model is operated by a consultant retained <br />by the City. The consultant will run the scenario and then issue a report with their <br />Docusign Envelope ID: 52DE2131-F0C9-4C18-86DD-6B9E7ADA8792