Laserfiche WebLink
<br />Page 33 <br /> <br />defined as gas transmission pipelines and hazardous liquid pipelines as regulated by <br />the U.S. Department of Transportation Pipeline and Hazardous Materials Safety <br />Administration (US DOT PHMSA). (Address this condition during construction) <br /> <br />115. POLLUTANT REDUCTION IN STORMWATER. At no time during construction of the <br />project shall pollutants be allowed to enter, clog, or contaminate storm drain pipe <br />networks or open stormwater channels in violation of Pleasanton Municipal Code <br />§9.14.080 et seq. The applicant shall contain all trash and debris for proper disposal <br />to authorized landfills or recyclers. Erosion control features shall be deployed during <br />the rainy season that extends from October 1st to April 15th each year, or any time rain <br />is forecast outside of this period. Best Management Practices (BMPs) shall be strictly <br />followed. Street sweepers must be employed if soil or debris is tracked onto the <br />public roads from vehicles exiting the site. Standard BMPs are available from the <br />California Stormwater Quality Association (CASQA), the United States Environmental <br />Protection Agency (EPA), Caltrans, and others. Notes and/or illustrations shall be <br />added to the plans that describe the BMPs to be utilized during construction. The use <br />of manufactured erosion control woven blankets and straw wattles that utilize plastic <br />monofilament netting is specifically prohibited. (Address this condition during <br />construction) <br /> <br />116. SWPPP REPORTING. Copies of any monitoring and/or sampling reports required by <br />the stormwater pollution prevention plan (SWPPP) and submitted by the Legally <br />Responsible Person (LRP) to the State of California’s SMARTS database shall also <br />be submitted to the City of Pleasanton inspector assigned to the project. The LRP <br />shall also submit to the City a copy of the required Annual Report no later than <br />September 1st of each year that construction is active or when erosion control features <br />have been deployed. The report must include a summary of all sampling and analysis <br />performed (Risk Levels 2 and 3 only), a log of all inspections performed, a summary of <br />any required corrective actions taken, and a summary of any violations. (Address this <br />condition during construction) <br /> <br />117. DUST CONTROL. Dust control measures must be employed during all phases of <br />construction to prevent airborne nuisance to neighboring properties. All stockpiles or <br />unused materials that can create dust shall be covered or removed. Exposed soil <br />areas shall be routinely watered until surfacing materials or landscaping is installed. <br />Use of dust palliatives shall conform to Caltrans Standard Specification Section 18. <br />Any damage caused by airborne dust to neighboring properties shall be cleaned with <br />costs paid by the applicant. If the applicant fails the address dust as directed by the <br />City, the City shall have the right to enter the property to effectuate the correction, with <br />all costs paid by the applicant or levied as a lien against the applicant’s property. <br />(Address this condition during construction) <br /> <br />Docusign Envelope ID: 52DE2131-F0C9-4C18-86DD-6B9E7ADA8792