Laserfiche WebLink
<br />Page 34 <br /> <br />118. PROPERTY NUISANCE. At no time during construction of the project shall the <br />condition of the property become a nuisance as defined in Pleasanton Municipal Code <br />§9.28.020. The City shall have the right to inspect the property for conditions that <br />violate the code standard. If a nuisance is found, the applicant shall immediately <br />submit a plan of correction. Depending on the severity of the nuisance, the City may <br />suspend all construction work until the condition is corrected. Any of the following <br />conditions shall be considered severe: Leaking chemicals that can cause <br />environmental damage; open excavations or any excavation deeper than 4 feet that <br />lacks proper shoring; unsecured materials that can fall to the ground causing damage <br />or injury; open or exposed utilities that could cause electrical shock or contamination <br />of sewer, potable water systems, groundwater wells, or storm drainage networks. If <br />the applicant fails the address the nuisance as directed by the City, the City shall have <br />the right to enter the property to effectuate the correction, with all costs paid by the <br />applicant or levied as a lien against the applicant’s property. (Address this condition <br />during construction) <br /> <br />119. NOISE. Construction noise is regulated under Pleasanton Municipal Code Chapter <br />9.04. Noise is prohibited outside of the hours of 8:00 am and 8:00 pm daily except <br />Sundays and holidays when noise is prohibited outside the hours of 10:00 am and <br />6:00 pm. Noise is defined as a level exceeding 83 dBA at a distance of 25 feet or 86 <br />dBA at any point beyond the boundary of the property under construction. If the <br />applicant fails the address the noise as directed by the City, the City shall have the <br />right to enter the property to effectuate the correction, with all costs paid by the <br />applicant or levied as a lien against the applicant’s property. Exceptions to these <br />regulations require a special permit granted by the City for circumstances when strict <br />compliance would be impractical or unreasonable, and contingent upon proper <br />noticing to surrounding property owners that includes the dates and times when noise <br />levels will be exceeded and the specific reasons why an exception to the regulation <br />has been granted. (Address this condition during construction) <br /> <br />120. DROUGHT RESTRICTIONS. If the City Council declares a drought during a time <br />when this development is under construction, as described in §9.30.010 et seq. of the <br />Pleasanton Municipal Code, the applicant shall utilize only recycled water under Stage <br />1 or greater restrictions for all non-potable construction-related water needs. <br />Recycled water is available at designated locations within the City, subject to the <br />applicant’s receipt of a temporary hydrant meter from the Operations Service Center <br />located at 3333 Busch Road. The applicant is responsible for all water costs based <br />on current billing rates. (Address this condition during construction) <br /> <br />121. GEOTECHNICAL FINAL REPORT. At the conclusion of construction, the applicant <br />shall submit to the City a final report from the Geotechnical Engineer or Certified <br />Engineering Geologist testifying to the successful completion of all material testing <br />and/or observation work performed. The final report must provide assurance that all <br />Docusign Envelope ID: 52DE2131-F0C9-4C18-86DD-6B9E7ADA8792