Laserfiche WebLink
<br /> <br /> <br />City of Pleasanton, CA (0012108.00) ii Woodard & Curran, Inc. <br />Pleasanton Long-Term Sewer CIP October 6, 2025 <br /> <br />TABLES <br />Table 1-1: Gravity Pipeline Information by Pipe Size <br />Table 1-2: Gravity Pipeline Information by Material <br />Table 1-3: Gravity Pipeline Information by Age <br />Table 1-4: Sewer Siphons <br />Table 1-5: Lift Station Information <br />Table 1-6: Force Main Information by Lift Station <br />Table 3-1: Priority A – Gravity Sewer Rehabilitation and Replacement <br />Table 3-2: Priority A – Lift Station Improvements <br />Table 3-3: Priority A – Sewer Inspection/Condition Assessment Projects <br />Table 3-4: Priority A – Capacity & Reliability Improvement Projects <br />Table 3-6: Priority A – Generator Upgrades/Replacements <br /> <br />FIGURES <br />Figure 1-1: Sewer Network <br />Figure 1-2: Lift Station Locations <br />Figure 2-1: Pipe Risk Priority <br />Figure 4-1: CIP Implementation – Scenario Comparison <br />Figure 4-2: Scenario 1 – Annual Spending by Fiscal Year <br />Figure 4-3: Scenario 2 – Annual Spending by Fiscal Year <br />Figure 4-4: Scenario 3 – Annual Spending by Fiscal Year <br /> <br /> <br />APPENDIX <br /> <br /> <br />Appendix A: Sewer System Management Plan <br />Page 210 of 323