My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
110425 REGULAR
>
CITY COUNCIL MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 1:05:40 PM
Creation date
12/26/2025 1:02:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/4/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />City of Pleasanton, CA (0012108.00) 2-4 Woodard & Curran, Inc. <br />Pleasanton Long-Term Sewer CIP October 6, 2025 <br />City’s network were found to be capacity deficient under dry weather flow conditions. However, two <br />locations exceeded the City’s freeboard criteria under wet weather conditions. Several alternatives were <br />developed to alleviate the capacity issues and were presented to the City. A preferred alternative for each <br />capacity project was selected based on a combination of cost, construction feasibility, and engineering <br />judgment. The preferred alternatives were added to the City’s near-term CIP. <br />Future developments were added to the model by combining data from the 2020 Tri-Valley Demand Study1, <br />data from the City’s Housing Element developed by the City’s Community Development Department (CDD), <br />and several East Pleasanton Specific Plan (EPSP) projects located near or outside the City’s existing urban <br />growth boundary. This list was updated again with the latest Housing Element developed by the CDD in <br />2022. These planned projects that will likely be constructed in the near-term (within approximately 10 years), <br />so any capacity issues caused by the additional developments need to be accounted for in the City’s long - <br />term CIP. Flow factors were assigned to single family, multi-family, and non-residential developments based <br />on factors derived from the water billing data, and the additional flow added was used to create the future <br />development scenario. <br />As with the existing sewer loads analysis, dry and wet weather scenarios were modeled using the future <br />loads to determine if any new capacity issues were caused by the increased flow. The same capacity <br />deficiency criteria were applied for future flow conditions, However, in cases where future peak wet weather <br />flows would result in any surcharge (flow exceeding full pipe capacity) due solely to future development, <br />then the City specified that capacity relief would be required before any new development could be <br />connected to the system. Once again, no sewers in the City’s network were found to be capacity deficient <br />under dry weather flow conditions. However, two locations exceeded the City’s capacity criteria under wet <br />weather conditions due solely to the additional flows added by the future developments, and alternatives <br />were developed to add additional capacity. The preferred capacity alternatives for the future load conditions <br />were added to the City’s CIP. <br />2.4 SCADA Master Plan (West Yost) <br />A separate planning study was performed by West Yost analyzing the City’s SCADA system in addition to <br />the Water and Sewer Master Plans. The report focuses on equipment, preventive maintenance, and cyber <br />security of the City’s existing SCADA system. The mos t applicable recommendation from the TM included <br />in the long-term CIP is the upgrade of lift station remote terminal units (RTUs), which integrate the stations <br />with the City’s SCADA system. No specific projects were included for RTU upgrades in the long-term CIP, <br />but these costs were assumed to be included as part of the mid- and long-term lift station rehabilitation <br />work. <br />2.5 Energy Master Plan (West Yost) <br />West Yost also completed an Energy Master Plan which evaluated and recommended mitigation measures <br />related to system resilience and renewable energy. Specific projects were recommended as part of this <br />report focusing on use of Distributed Energy Resources (DERs), microgrids, time-of-use management (TOU), <br />as well as process control strategies to evaluate energy optimization. These strategies were recommended <br />at several of the lift stations to improve reliability and resiliency. Similar to the SCADA upgrades, no specific <br /> <br />1. Woodard & Curran, 2020 Tri-Valley Demand Study Municipal and Industrial Demand Study, 2021 <br />Page 223 of 323
The URL can be used to link to this page
Your browser does not support the video tag.