Laserfiche WebLink
<br /> <br /> <br />City of Pleasanton, CA (0012108.00) 2-7 Woodard & Curran, Inc. <br />Pleasanton Long-Term Sewer CIP October 6, 2025 <br />The inspections will be prioritized based on the same types of factors used for gravity pipe risk assessment. <br />The force main inspections may include visual assessment of pipe alignments, inspection of discharge <br />manholes, ultrasonic pipe thickness testing if feasible/appropriate, and actual internal CCTV inspection or <br />other technology to assess pipe condition if possible. Any force mains that can be CCTV inspected (or <br />partially inspected) may be added to the gravity pipe CCTV inspection program to be conducted by <br />contractors. Once available, needed improvements based on the results of the condition assessments will <br />be prioritized and scheduled into the City’s long-term capital improvement plan as appropriate. <br />2.7.4 Asset Management Plan <br />The City is currently in the process of developing a City-wide asset management program. As part of this <br />program the sewer utility will need to develop its approach to asset management that integrates with the <br />City’s overall asset management plan. <br /> <br />2.7.5 Cathodic Protection and Installation and I/I Studies <br />The City plans to perform an inventory and assess the effectiveness of its cathodic protection along pipeline <br />and lift stations. Corrosion can drastically reduce the expected useful life of both lift station components <br />and metallic pipes. To address this, the City has also allocated funding in the near, mid, and long term to <br />install new cathodic protection systems following the study. <br />In addition, high I/I can significantly increase wet weather flows in sewer mains and may contribute to spills, <br />so the City may perform further investigations in areas prone to higher I/I. <br />Page 226 of 323