<br /> <br /> <br />City of Pleasanton, CA (0012108.00) 3-2 Woodard & Curran, Inc. <br />Pleasanton Long-Term Sewer CIP October 6, 2025 <br />These FTEs are not assumed to be permanent positions and may be phased out if capital project workloads <br />decrease. <br />3.3 Priority A Projects and Costs <br />The following sections describe the Priority A projects broken out by their program category. Each section <br />gives a brief rational for why these assets received a Priority A rating and summarizes the costs shown in <br />the long-term CIP (see Section 4). <br />3.3.1 Gravity Sewer R&R <br />Seven high risk pipes received a rehabilitation/replacement action based on the results of the gravity <br />condition assessment. These pipes all have at least one severe structural defect (NASSCO PACP grade 4 or <br />5), which NASSCO defines as a pipe that will fail in the near-term or has already failed. Based on these <br />results, these pipes were assigned to priority A as near -term replacement/rehabilitation recommendations. <br />These pipes have a variety of preliminary rehabilitation recommendations based on the defects present in <br />each pipe, but for simplicity they are presented as a single line item in the CIP. A detailed recommendation <br />of each pipe’s specific R&R action can be found in the Pleasanton Sewer Condition Assessment and <br />Rehabilitation/Replacement Recommendations technical memorandum. Additional costs for pavement and <br />sidewalk replacement were also included under the “Annual Sewer Collection System Improvements for <br />Resurfacing”. <br />Funding in this line item may also be used to rehabilitate or repair large diameter sewer mains, sewer <br />siphons, and force mains. As noted in Section 2.7 the condition of these assets is currently unknown and is <br />expected to be assessed over the next 3 to 5 years. If any of these assets are found to be in poor condition, <br />this funding can support near-term rehabilitation efforts. Total funding allocations for both gravity sewers <br />and other asset classes will be re-evaluated during the next sewer rate study, scheduled for 2030. <br />Also included in this line item is the CCTV inspection cost for high priority gravity mains identified in the <br />condition assessment analysis. These pipes received a high risk priority based on their age, material, cleaning <br />frequency, and COF factors (See Section 2.1 for additional details), and their actual condition should be <br />determined in the near-term so an analysis of any defects present can be performed. A summary of pipeline <br />R&R costs as well as costs for inspection of the high priority CCTV pipes without inspection data are shown <br />below in Table 3-1. <br />An additional condition project was included based on City staff feedback. The Amberwood Siphon has <br />been noted to be in poor condition and there is concern that it is capacity deficient, and unable to convey <br />flows under Arroyo Mocho. If this siphon failed or became clogged, it could lead to SSOs in the residential <br />neighborhood upstream of the siphon and it is therefore considered high priority. A preliminary cost has <br />been included in Table 3-1. <br /> <br /> <br /> <br /> <br />Page 228 of 323