Laserfiche WebLink
<br /> <br /> <br />City of Pleasanton, CA (0012108.00) 3-3 Woodard & Curran, Inc. <br />Pleasanton Long-Term Sewer CIP October 6, 2025 <br /> <br />TABLE 3-1: PRIORITY A – GRAVITY SEWER REHABILITATION AND REPLACEMENT <br />Project Notes Estimated Total <br />Capital Cost <br />Pipeline Replacement <br />Pipeline Replacement includes <br />replacement and repair of high priority <br />pipes, as well as CCTV inspection and <br />PACP coding for high risk pipes <br />without CCTV inspections1. This <br />funding can also be used to other <br />near-term high priority pipeline <br />projects such as force mains, large <br />diameter sewers, and siphons as <br />inspections are completed. <br />Varies by <br />scenario see <br />Section 4 for <br />additional <br />details <br />Amberwood Siphon Identified by City staff $3,330,000 <br />Annual Sewer Collection System <br />Improvements for Resurfacing $1,050,000 <br /> <br />Cathodic Protection and I&I Studies $150,000 <br />Cathodic Protection Installation Projects will be identified by the <br />cathodic protection study. <br />Varies by <br />scenario see <br />Section 4 for <br />additional <br />details <br />Denker Road Sewer Replacement <br />Identified by City staff after reviewing <br />CCTV video in the Val Vista <br />neighborhood. The existing pipe is in <br />need of immediate repair/replacement <br />$1,650,000 <br />1. These priority CCTV inspections are assumed to be performed by a CCTV contractor assisting existing City CCTV crews to <br />complete the inspections in the near term. <br /> <br /> <br /> <br />Page 229 of 323