My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
110425 REGULAR
>
CITY COUNCIL MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 1:05:40 PM
Creation date
12/26/2025 1:02:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/4/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />City of Pleasanton, CA (0012108.00) 4-2 Woodard & Curran, Inc. <br />Pleasanton Long-Term Sewer CIP October 6, 2025 <br />Scenario 1 – Maintain: This scenario offers a balanced approach, deferring some projects while aiming to <br />reduce the backlog of gravity sewers with major defects. While less aggressive than Scenario 2, this option <br />still requires more than double the City’s current capital spending by FY27 to avoid deferring Priority A <br />work. To capture the risk in delaying projects, a line item representing unplanned/emergency repairs equal <br />to 2.5% of City-funded capital projects is included in this scenario. A chart of spen ding by year is shown in <br />Figure 4-2. <br />Capacity Projects: <br />• All priority A capacity projects are completed in the near term. <br />Lift Station Projects: <br />• Some near-term lift station projects are delayed to the mid-term, and some mid-term projects are <br />delayed to the long-term. <br />Condition Assessment Projects: <br />• This scenario targets full repair/replacement of pipes with existing major defects by FY30 –31, with <br />$3M annually (corresponding to approximately 1.5 miles of sewer) available starting in FY27–28. <br />This funding assumes the pipes analyzed in Pleasanton Sewer Condition Assessment are <br />representative of the entire sewer system, and that only ~4.5% of pipes in the system require some <br />type of rehabilitation. If more defects are found than expected, the backlog of pipes in need of <br />rehabilitation or replacement will grow in the near-term. This is especially true if siphons, <br />forcemains, or trunk sewers are found to be in poor condition during their near-term studies and <br />funding is needed for emergency repairs. <br />Staffing: <br />• This scenario requires 2 to 3 additional staff starting in FY27, managing an average of $8.4M <br />annually (excluding FY25–26). Staffing increases to 4 FTEs from FY31–33 to complete major pipeline <br />and lift station work. <br /> <br />FIGURE 4-2: SCENARIO 1 – ANNUAL SPENDING BY FISCAL YEAR <br /> <br />$0 <br />$5 <br />$10 <br />$15 <br />CI <br />P <br /> <br />C <br />o <br />s <br />t <br /> <br />( <br />$ <br />M <br />) <br />Priority A Priority B <br />Priority C FTE <br />Page 236 of 323