My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
110425 REGULAR
>
CITY COUNCIL MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 1:05:40 PM
Creation date
12/26/2025 1:02:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/4/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />City of Pleasanton, CA (0012108.00) 4-3 Woodard & Curran, Inc. <br />Pleasanton Long-Term Sewer CIP October 6, 2025 <br />Scenario 2 – Projects Funded by Priority: Minimizes the City’s risk by proactively investing in rehabilitation <br />and replacement of high-risk assets. This scenario offers the most flexible near-term spending to address <br />the findings of gravity main, large diameter sewer main, siphon, and force main studies. However, the high <br />up-front spending in the next 5 years may be difficult to achieve, given the City’s current capital spending <br />of ~$3M. A chart of spending by year is shown in Figure 4-3. <br />Capacity Projects: <br />• All priority A capacity projects are completed in the near term. <br />Lift Station Projects: <br />• All priority A lift station projects are completed in the near-term, and all priority B projects are <br />completed in the mid-term. <br />Condition Assessment Projects: <br />• Aims to eliminate the backlog of pipes with severe defects by FY30, based on findings from the <br />recent Pleasanton Sewer Condition Assessment. However, if additional asset in poor-condition are <br />identified (e.g., siphons, forcemains, large-diameter trunk sewers), this scenario provides the most <br />flexibility to address them in the near term, with $6M available in FY27 –28 and $3M every year <br />thereafter. The intent of this scenario is to minimize the City’s backlog of projects before the next <br />rate study. <br />Staffing: <br />• This scenario requires 3 to 4 additional staff in the near to medium term (FY27 –35) to manage $5– <br />15M in capital work. FTE requirements decrease to 2 in the long term (FY35–44), managing an <br />average of $6.5M annually. <br /> <br />FIGURE 4-3: SCENARIO 2 – ANNUAL SPENDING BY FISCAL YEAR <br /> <br />$0 <br />$2 <br />$4 <br />$6 <br />$8 <br />$10 <br />$12 <br />$14 <br />CI <br />P <br /> <br />C <br />o <br />s <br />t <br /> <br />( <br />$ <br />M <br />) <br />Priority A Priority B <br />Priority C FTE <br />Page 237 of 323
The URL can be used to link to this page
Your browser does not support the video tag.