Page 4 of 10 <br />Iron Horse Trail and the proposed construction of the Valley Link Rail Station. These <br />improvements are not contingent upon the site’s redevelopment as outlined in the scenarios <br />(i.e., they are planned independently of the site's redevelopment); however, they have been <br />taken into account in evaluating site opportunities and constraints, as well as in the overall site <br />planning. <br /> <br />Iron Horse Trail Improvements <br />Starting in early 2026, BART will improve the Iron Horse Trail segment at the station with a <br />two-way bicycle track that would be separated from vehicle traffic and from the pedestrian <br />sidewalk, pedestrian-scale lighting, improved lighting under the freeway and elevated BART <br />structures, additional secure bicycle parking, wayfinding and signage, landscaping and storm <br />water management features, safety and security features, a small park/plaza/gateway <br />treatment at the transition to the Iron Horse Trail to the north, and public art. To facilitate and <br />encourage bicycle access to the station, the bike lanes along Owens Drive will be striped to <br />allow bicyclists to cross the street more efficiently at the existing signalized intersection. <br /> <br />Valley Link Station <br />Construction of the Valley Link Rail line would provide a rail connection between the subject <br />BART station (and therefore the Tri-Valley and greater Bay Area) and the San Joaquin Valley. <br />A new aerial station platform would be constructed, along with pedestrian access, including <br />stairs, elevators, and escalators. Currently, the anticipated timeframe for the construction of <br />the Valley Link station is 2028. <br /> <br />Attachment 2 to this report provides additional detail regarding the site’s existing conditions, <br />planned improvements, and constraints. <br /> <br />DISCUSSION <br />Process to Date <br />As mentioned in this report, the City’s Housing Element identifies the site for housing and, as <br />part of an implementation program, calls for the preparation of a concept plan to facilitate the <br />future construction of housing on the site. To date, the project team has initiated this process <br />and conducted preliminary analysis in the form of an evaluation of civil engineering constraints, <br />a market assessment to understand the potential for complementary non-residential uses, and <br />an assessment of other opportunities and constraints as described above. The project team <br />has drafted goals and objectives (discussed further below) that would be incorporated into the <br />final concept plan. Additionally, due to the collaborative nature of the project, BART, as the <br />property owner, and the City have signed an MOU to formalize the cooperation between the <br />two agencies for this effort. <br /> <br />The site scenarios presented at this City Council meeting were shared at a Community <br />Meeting on September 17 and with the Planning Commission at its October 22 meeting. <br />Feedback from both is summarized below. <br /> <br />Community Meeting, September 17, 2025 <br />The City, in collaboration with the project team, hosted a virtual Community Meeting on <br />September 17, 2025, to provide the general public with an introduction to the project and solicit <br />feedback on the site-reuse options. While attendance at the meeting was low despite outreach, <br />the project team anticipates that interest in the project will increase as more materials are <br />drafted, circulated, and discussed at public meetings. Feedback received from attendees of the <br />Page 110 of 399