My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
111825 REGULAR
>
CITY COUNCIL MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 1:59:45 PM
Creation date
12/26/2025 1:52:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pleasanton BART October 9, 2025 <br />Site Re-Use Options Memorandum <br /> <br /> <br />12 <br /> <br />4. Development Capacity <br />a. Development Sites1 <br />The project site currently consists of two sites, with a gross area of 14.9 acres and a net area of <br />11.34 acres excluding easement areas. The site is located in the City of Pleasanton’s “Planned <br />Unit Development Mixed Use (PUD- MU)/Housing Opportunity Zone (HOZ)” district. As per <br />BART's TOD Guidelines, the site’s TOD Place Type is “Neighborhood/Town Center.” BART’s <br />TOD Zoning standards and Assembly Bill 2923 (2018) set the following standards for zoning of <br />the site: <br />• Minimum allowable residential density: 75 dwelling units per acre <br />• Minimum allowable height: five stories <br />• Minimum allowable FAR: 3.00 <br /> <br />The overall site may be developed as three to four distinct sites/developments with the central <br />area (encompassing the Iron Horse trail), envisioned as a plaza. The gross site area for each <br />prospective site is shown in the diagram below. <br /> <br />Figure 4-1: Project site divided into four prospective development sites. <br /> <br />1 Please note that the parcels and areas shown only conceptual. The project site currently exists as two <br />parcels (Sites 1+2+Plaza and Sites 3+4). <br />Page 128 of 399
The URL can be used to link to this page
Your browser does not support the video tag.