My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
111825 REGULAR
>
CITY COUNCIL MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 1:59:45 PM
Creation date
12/26/2025 1:52:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pleasanton BART October 9, 2025 <br />Site Re-Use Options Memorandum <br /> <br /> <br />13 <br /> <br />b. Holding Capacity <br />i. Option C-1: Four Sites, Five to Seven Stories Tall, up to 1,088 units <br />This option divides the site into four sites ranging in size from ~2.35 to 4.25 acres. Sites 3 and 4 <br />are imagined as separate buildings with a mews in the middle. Sites 1 and 2 are shown at five <br />stories tall while Sites 3 and 4 comprise seven stories. The total number of units ranges from <br />870-1,088 (assuming an average unit area of 800-1,000 SF per unit). BART rider parking is <br />assumed to be located within the westernmost building. <br /> <br /> Figure 4-2: Holding capacity study across 4 Sites. <br /> <br />i. Option C-2: Three Sites, Five to Seven Stories Tall, up to 1,309 units <br />This option divides the site into three sites with the two on the west being roughly similar to the <br />first option. The east side, however, is imagined as one large development with site area ~7.98 <br />acres. Sites 1 and 2 are shown at seven stories tall while in the base option, Site 3-4 has five <br />stories. The total number of units shown in the base option ranges from 818-1,023 (assuming <br />an average unit area of 800-1,000 SF per unit). BART rider parking is assumed to be located <br />within the building to the east of the plaza. <br /> <br />An alternative for Site 3 shows the maximum buildout at eight stories with a total of 1,047-1,309 <br />units. <br /> <br /> Figure 4-3: Holding capacity study across 3 Sites. <br /> <br /> <br /> <br />TOTAL NEW HOMES: <br />870-1,088 <br />Density: 58-77 units <br />per acre <br />Parking ratio: 0.82-1 <br />space per unit <br />Base option <br />(anticipated holding <br />capacity) <br /> <br />TOTAL NEW HOMES: 818- <br />1,023 <br /> <br />Density: ~75 units per acre <br />Parking ratio: 0.82-1 space <br />per unit <br />Max holding capacity <br />TOTAL NEW APARTMENT HOMES: <br />1,047-1,309 <br />Density: 75-92 units per acre <br />Parking ratio: 0.78-0.97 spaces per unit <br />Page 129 of 399
The URL can be used to link to this page
Your browser does not support the video tag.