Laserfiche WebLink
<br />San Francisco Bay Area <br />Rapid Transit <br />MEMORANDUM <br />To: Dublin/Pleasanton Station Transit-Oriented Development Team <br />Date: September 8, 2025 <br />Re: Dublin/Pleasanton Station TOD Basis of Design Criteria <br />Here is a summary of criteria to be incorporated into the Dublin/Pleasanton Station Transit Oriented Development (TOD) Basis of Design (BOD). These criteria are intended to provide the Developer’s Design Team with information to develop a comprehensive and project specific BOD and Maintenance Responsibility Matrix that will be submitted and reviewed by BART to communicate how the development intends to address the operational and design needs of the District. This initial statement of criteria is not intended to replace future criteria that will <br />result from site specific field and technical investigations. The development team is responsible for verification of actual field conditions and addressing code compliance requirements as they apply to this development both from local agencies and BART. <br />Should additional information be required, a request should be made through Shannon Dodge, Principal Property Development Officer with BART Transit-Oriented Development. Some information will require Security Sensitive Information (SSI) clearance, and some files may be required to be viewed on BART property only. <br /> <br />BART Permits: 1) Permits for development on BART property are required. Permits will be required for: a. Site Investigation (drilling, monitoring, surveying of BART facilities) b. All construction and staging on non-leased parcel(s). c. Operation of facilities in and under the BART Operating Envelope and station. 2) BART Permit conditions will include limitations to minimize passenger impacts, emergency access, maintain the security of the station, and mitigate any impacts on the maintenance and station operations. 3) BART permit conditions may include considerations with respect to passenger impacts, security, and transit and maintenance operations. <br />Design Considerations for the BOD and Maintenance Responsibility Matrix: <br />The development team should prepare BOD and Maintenance Responsibility Matrix submittals that address the operational requirements and constraints included herein. Submission of the <br />Page 311 of 399