Laserfiche WebLink
<br />2 <br />BOD and Maintenance Responsibility Matrix is required when submitting plans for review by BART, and providing them is a prerequisite for BART’s review. <br />The Maintenance Responsibility Matrix should include a list of assumptions detailing which entity would be responsible for maintaining the proposed infrastructure. (For example: BART is assumed to maintain lighting in the station and substation areas, but the Developer should maintain lighting in public spaces near the proposed development. Lighting on BART property shall comply with the foot-candle requirements of the current BART Facilities Standards [BFS]. Lighting on leased parcels shall comply with the foot-candle requirements of the local permitting jurisdiction, unless shared use with BART patrons. Lights not maintained by BART shall be connected to a new power source from PG&E and metered to the Development; separate metering may be necessary for lighting that might impact BART patrons.) <br />The following is a table template recommended to ensure BART understands the design assumptions for the project: <br /> Owner List of Assets Maintenance Provider Additional Permitting Agencies <br />Design Criteria Design Criteria Exception Request <br />BART BFS <br />Developer or Third-Party <br /> <br />City or other agency <br />Preliminary Design Criteria/Requirements Considerations for Dublin/Pleasanton TOD <br />Improvements: <br />Based on the existing site and future BART planning for improvements, the following criteria have been developed. Relevant sections of the BART Facilities Standards (BFS) can be provided for reference, if needed. The Developer team shall address the following in the BOD: <br />A) Utilities a. Any new or relocated wet utilities (such as water and sewer) and communication/electrical conduits serving the District are to be clear and away from the private structural developments. All the requirements of National Fire Protect Association 13 (NFPA 13) and BFS are applied. b. Sewer and Water connections to existing BART facilities shall not be disrupted during operation hours. c. Irrigation: New BART irrigation system to be certified by CalSense is required to serve the Remainder Parcel(s). <br />Page 312 of 399