Laserfiche WebLink
Page 5 of 14 <br />such as improper containment of contaminants and inadequate housekeeping <br />practices. <br />• Expired permits, including the facility’s Temporary Use Permit and its Stormwater <br />Industrial General Permit. <br /> <br />As a result of these findings, in March 2025, LPFD—acting as the Certified Unified <br />Program Agency (CUPA) for both Livermore and Pleasanton—issued a consent order to <br />PGS. The order included fines and required PGS to retain an Environmental Health and <br />Safety professional or consultant, as well as establish and maintain employee training <br />programs on hazardous waste handling. <br /> <br />The persistence of both the franchise agreement and transfer station compliance issues <br />reflects a broader pattern of management not adequately addressing critical reporting, <br />operational, and regulatory requirements. The City has a responsibility to ensure that all <br />reporting and compliance obligations are met to remain in compliance with state law. <br />Failure to comply could carry significant financial and regulatory risks. The City is <br />evaluated annually for SB 1383 compliance, and if found to be in violation during a <br />CalRecycle review, it could face administrative civil penalties ranging from $7,500 to <br />$10,000 or more per day, per violation. Similarly, violations under CUPA or the State <br />Water Resources Control Board can result in fines of up to $25,000 per day per violation. <br /> <br />Regardless of the specific actions taken to address noise, odor, traffic, and stormwater <br />concerns at the current Transfer Station, the related capital costs will be substantial (tens of <br />millions of dollars). <br /> <br />Infrastructure and Capital Investment Needs <br />The transfer station has supported the City’s solid waste operations and provided a location <br />for the public to dispose of materials for many years. However, current conditions, including <br />unresolved compliance matters, site constraints, and land use concerns, have prompted long- <br />term facility planning and evaluation of alternatives. <br /> <br />Significant capital improvements, estimated in the tens of millions of dollars, will be required to <br />upgrade the existing transfer station and address operational and neighborhood impacts. <br />Relocating to a new site would involve even greater costs and permitting risks. A study <br />conducted by SCS Engineers on behalf of the City estimated a low- and high-range cost of <br />$10,000,000 to $23,000,000 to relocate the existing facility. However, this range does not <br />include land acquisition or site-specific factors that would increase costs, such as extensive <br />excavation, rock removal, retaining wall construction, or additional utility infrastructure for <br />power and water. PGS estimates a potential cost range of $50,000,000 to $100,000,000, <br />including land acquisition. <br /> <br />PGS has provided a preliminary proposal concept stating that upgrades to the existing <br />facility could be completed within two to four years, whereas a new facility would likely <br />take six to ten years, contingent upon land acquisition, permitting, and other infrastructure <br />development for a new site. Modifying the existing facility could address near-term needs. <br />However, further analysis is needed to determine the extent to which such mitigations <br />could serve as a longer-term or permanent solution, especially given the proximity of new <br />residential development to the current site. If, after investing in upgrades to the existing <br />Page 77 of 399