Laserfiche WebLink
Page 2 of 8 <br />(CEQA) pursuant to Public Resources Code Section 15061(b)(3) <br /> <br />2. Introduce an ordinance approving Case P25-0352, rescinding City Council Resolution <br />No. 91-132, and amending Chapters 18.08, 18.12, 18.20, 18.22, 18.68, 18.103, 18.104, <br />18.105, 18.110, 18.116, 18.124, 18.128, 18.132, and 18.144 of the PMC, as shown in <br />Attachment 1. <br /> <br /> <br />BACKGROUND <br />In recent years, staff has received feedback from the development community and the public <br />that the City’s current application review processes are burdensome and present barriers to <br />development. The City Council identified amending the Pleasanton Municipal Code (PMC) and <br />improving processes to simplify permitting, reduce delays, streamline the Design Review <br />process, and support business and retail attraction as a priority project during the current two- <br />year budget cycle. In addition, the recent budget reductions approved by the City Council <br />included a return to a more limited and cost-effective neighborhood notice requirement, more <br />closely aligned with the requirements of the Government Code, rather than the City’s current <br />notice procedures that result in greater costs and are labor-intensive. <br /> <br />Based on this direction, staff conducted a review and analysis of the PMC and identified three <br />key areas for improvement: 1) the Design Review process, 2) noticing procedures, and 3) <br />appeals and call-up procedures. The analysis included a review of neighboring jurisdictions' <br />procedures, gathering an inventory of common process complaints, and analyzing data for the <br />most common Planning application types (i.e., Design Review). <br /> <br />Existing Design Review Process <br />Projects involving exterior changes typically require a Design Review (DR) permit through the <br />Planning Division, followed by review and issuance of building permits through the Building <br />and Safety Division. <br /> <br />Both the Design Review and Building Permit review processes involve evaluation by all <br />applicable City divisions (e.g., Planning, Engineering, Landscape Architecture, and Traffic) to <br />ensure compliance with codes, policies, and guidelines. However, as a discretionary process, <br />aesthetic and design aspects of the projects are reviewed as part of a DR application, and <br />there is an opportunity for neighborhood notification and input. The hearing authority (i.e., the <br />Zoning Administrator or Planning Commission) may approve, conditionally approve, or deny <br />applications based on a set of established criteria (e.g., relationship of proposal to surrounding <br />sites and preservation of views). <br /> <br />PMC Chapter 18.20 (Design Review) prescribes which project types are subject to design <br />review, outlines the level of required review (administrative/staff-level versus Planning <br />Commission), contains a series of “criteria” against which projects are evaluated, and <br />establishes procedures for review, appeal, and call up of projects. Chapter 18.20 has not <br />undergone a comprehensive review and update since 1993. <br /> <br />The DR process is required for a wide range of projects, from new commercial/industrial <br />buildings to the construction of small residential accessory structures such as arbors, and <br />minor exterior commercial building and site modifications. Single-family residential projects are <br />processed with an Administrative Design Review (ADR). The DR process is valuable because <br />Page 131 of 200