My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
120225 REGULAR
>
CITY COUNCIL MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 2:05:09 PM
Creation date
12/26/2025 2:03:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/2/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 8 <br />it protects neighborhood character, scale, and privacy. However, current regulations require <br />the DR process for very minor projects (e.g., changing a window to a door on a commercial <br />building or a backyard residential accessory structure) that are objectively likely to have little to <br />no impact on the community. <br /> <br />Based on a review of 10 years of data, staff has processed an average of 110 ADRs annually. <br />A typical ADR takes between 3.5 and 7.5 hours to process; on aggregate, this accounts for the <br />equivalent of 20 to 40 percent of one full-time employee (FTE, Associate Planner). This figure <br />does not include hours spent by other City divisions and administrative staff. The application <br />fee for an ADR is currently set at $345, which is significantly lower than the actual cost of staff <br />time to process a typical application. <br /> <br />Over the past five years, staff has processed an average of 42 Design Review applications <br />annually. While hours spent processing DR applications are harder to quantify, since they can <br />vary widely from project to project, and are often processed in tandem with other land use <br />entitlements, a DR application typically takes a similar or greater number of hours to process <br />than an ADR. A breakdown of the data is included in Exhibit B of Attachment 3. With a high <br />workload, review of small DR and ADR projects detracts from staff’s ability to efficiently <br />process larger project applications that reflect more significant investments in the community. <br /> <br />DR for small residential and commercial projects, which form the largest share of applications <br />processed, can demand almost as much time and resources to process as larger projects. The <br />DR process particularly burdens homeowners and small business owners by adding months to <br />the review process and requiring additional sets of professionally prepared plans, beyond <br />those required for the issuance of a Building Permit. <br /> <br />Noticing <br />Currently, the public notification radius requirements are outlined in PMC Chapter 18.12, <br />throughout PMC Title 18, and specified by City Council Resolution No. 91-132, (Attachment 2). <br />Generally, local requirements far exceed those specified in the Government Code. For <br />example, for projects subject to Planning Commission (PC) review and approval, a 1,000-foot <br />radius is used for public noticing per City standards, where a 300-foot radius is required by <br />Government Code. <br /> <br />More recently, the City adopted an administrative policy for on-site project notification. This <br />requires on-site project notifications for projects or applications that are subject to a public <br />hearing before the PC or City Council, projects that add one or more dwelling units, excluding <br />Accessory Dwelling Units (ADUs), or other projects at the determination of the Zoning <br />Administrator (ZA). <br /> <br />For many projects where no public hearing is required by the PMC or Government Code (e.g., <br />residential additions subject to ADR), the City’s current practice is to send out project <br />notification cards to immediately adjacent neighbors. The mailed project notification radius is <br />determined on a project-by-project basis by the ZA. Project notification is intended to allow an <br />opportunity for neighbors near a project to identify concerns or request public hearings prior to <br />ZA approval. Requests for ZA hearings are infrequent (typically five or fewer per year), out of <br />100+ ADRs processed annually. In staff’s review, hearing requests were most often made for <br />projects involving second-story additions, balconies where there is a perceived impact on <br />privacy, or where there have been pre-existing conflicts or disagreements between neighbors. <br />Page 132 of 200
The URL can be used to link to this page
Your browser does not support the video tag.