My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
120225 REGULAR
>
CITY COUNCIL MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 2:05:09 PM
Creation date
12/26/2025 2:03:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/2/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 8 <br /> <br />Appeals <br />As outlined in PMC Chapter 18.144, the current appeal process is lengthy and can last 15 to <br />30 or more days. The “effective date” of an approval is set based on the duration of the appeal <br />period and is the first date on which a project can legally be issued building permits or begin <br />operations. The effective date can vary substantially from project to project because, in <br />addition to the general appeal period (15 days), PMC provisions allow the City Council to <br />review (“call up”) actions of a ZA or PC decision. These provisions can cause lengthy delays in <br />approval when City Council meetings are canceled or there are long periods between <br />meetings. The City’s general appeal period is significantly longer than neighboring <br />jurisdictions, where appeal periods are typically 10 days. <br /> <br />City Process Timeline <br />Due to the review, noticing, and appeal procedures described above, Design Review can add <br />anywhere from one to six months or more of additional review time for a project, depending on <br />the project's complexity and scope, as well as the quality of materials submitted to the City. <br />ADRs have the quickest turnaround time for Design Review applications, adding a minimum of <br />30 days (and more typically 40 days) of City process time before an applicant can apply for <br />building permits. <br /> <br />DISCUSSION <br />Staff recommends a series of PMC amendments that seek to simplify, clarify, and streamline the <br />City’s processes. The amendments will reduce barriers to obtaining building permits for certain <br />types of projects, improve and clarify processes and approval findings, align appeal periods with <br />neighboring jurisdictions, and more closely align noticing requirements with the Government <br />Code. A summary of the proposed changes to the PMC is provided below. <br /> <br />Design Review Amendments: Chapter 18.20 <br />Staff recommends a comprehensive revision of PMC Chapter 18.20, which would rescind the <br />current Chapter and replace it with amended procedures. The recommendations include revising <br />the projects subject to Design Review, modifying the current, and somewhat vague “criteria for <br />approval” to reflect more typical approval findings, and clarifying Design Review procedures. <br /> <br />Staff believes it is reasonable to no longer require DR for several project types. These projects <br />would still be required to meet all applicable codes, policies, and adopted plans, and would <br />continue to be reviewed by all relevant City divisions through the building permit process. Table <br />1, below, summarizes projects that staff recommends be exempt from Design Review: <br /> <br />Table 1. Summary of Project Types Proposed to be Exempt from Design Review <br />Single-family Multi-family Commercial <br />• Fences <br />• New accessory <br />structures and buildings <br />(e.g., sheds, pool <br />house, pavilions) <br />• New lofts without <br />• Minor exterior <br />building <br />modifications (e.g., <br />materials change or <br />building re-paint)* <br />• Minor site <br />• Refacing or replacing <br />existing signs with minor <br />alterations to existing <br />signage (e.g., installing a <br />new sign that is a similar <br />size and style to what <br />Page 133 of 200
The URL can be used to link to this page
Your browser does not support the video tag.