Laserfiche WebLink
<br /> <br />PUD-54-01M <br />Page 4 of 6 <br /> <br />Any alterations to pedestrian paths of travel must conform to current standards for the <br />disabled. Any walking member of the public with a visual impairment (cane or guide dog) <br />must be escorted through the construction zone. (Address this condition during construction) <br /> <br />18. HIGH VISIBILITY SAFETY APPAREL: All workers on foot who are exposed to the hazard of <br />vehicular traffic shall wear warning garments such as vests, jackets, or shirts manufactured in <br />accordance with the requirements of the American National Standards Institute <br />(ANSI)/International Safety Equipment Association (ISEA) 107-2004 Performance Class 2, high <br />visibility safety apparel and headwear, or any updates adopted by Cal OSHA. During hours of <br />darkness, warning garments shall be retroreflective with visibility from a minimum 1,000 feet. <br />(Address this condition during construction) <br /> <br />19. EXCAVATION SAFETY: All excavations must be performed in conformance with California <br />Government Code Section 4216 et seq. No excavation shall occur until proper notice is <br />provided to Underground Service Alert (usanorth811.org) by calling either 811 or 800-642-2444 <br />at least 72-hours prior to the work so buried utilities can be marked. All <br /> excavations shall be covered or barricaded to prevent entry when work is inactive. Open <br />excavations in the public right-of-way must be covered by skid-resistant steel plates that are <br />firmly affixed to the surface with leading edges ramped. Excavations 5-feet and deeper require <br />a protective system as defined by Cal-OSHA. If a shoring system or trench boxes will be utilized <br />as the protective system, said system shall either be manufactured and installed according to <br />manufacturer recommendations, or designed by a registered professional engineer and <br />installed according to approved plans. No excavation shall be performed atop or adjacent to a <br />high-risk facility until authorized by the owner of the facility. High-risk facilities are defined as <br />gas transmission pipelines and hazardous liquid pipelines as regulated by the U.S. Department <br />of Transportation Pipeline and Hazardous Materials Safety Administration (US DOT PHMSA) <br />(Address this condition during construction) <br /> <br />20. POLLUTANT REDUCTION IN STORMWATER: At no time during construction of the project <br />shall pollutants be allowed to enter, clog, or contaminate storm drain pipe networks or open <br />stormwater channels in violation of Pleasanton Municipal Code §9.14.080 et seq. The <br />applicant shall contain all trash and debris for proper disposal to authorized landfills or <br />recyclers. Erosion control features shall be deployed during the rainy season that extends <br />from October 1st to April 15th each year, or any time rain is forecast outside of this period. <br />Best Management Practices (BMPs) shall be strictly followed. Street sweepers must be <br />employed if soil or debris is tracked onto the public roads from vehicles exiting the site. <br />Standard BMPs are available from the California Stormwater Quality Association (CASQA), <br />the United States Environmental Protection Agency (EPA), Caltrans, and others. Notes <br />and/or illustrations shall be added to the plans that describe the BMPs to be utilized during <br />construction. The use of manufactured erosion control woven blankets and straw wattles that <br />utilize plastic monofilament netting is specifically prohibited. (Address this condition during <br />construction) <br />21. DUST CONTROL: Dust control measures must be employed during all phases of <br />construction to prevent airborne nuisance to neighboring properties. All stockpiles or unused <br />materials that can create dust shall be covered or removed. Exposed soil areas shall be <br />routinely watered until surfacing materials or landscaping is installed. Use of dust palliatives <br />shall conform to Caltrans Standard Specification Section 18. Any damage caused by <br />airborne dust to neighboring properties shall be cleaned with costs paid by the applicant. If <br />the applicant fails the address dust as directed by the City, the City shall have the right to <br />enter the property to effectuate the correction, with all costs paid by the applicant or levied as <br />Page 28 of 200