Laserfiche WebLink
Page 4 of 6 <br />City Council meeting. <br /> <br />Economic Vitality Committee Recommendation <br />The Economic Vitality Committee (EVC) received an overview of the feasibility process, draft <br />service plan, and results at its December 19, 2024, meeting for a recommendation to the City <br />Council on the formation of a PBID. The proposed schedule for Phase 2 PBID formation as <br />presented to the EVC was approximately five months to complete. <br /> <br />Based on the feasibility study results that noted additional education with property owners to <br />reach a level of engagement necessary to generate majority support for PBID formation, the <br />EVC voted to proceed with Phase 2 of the PBID feasibility comprising of two parts. The first <br />part, Phase 2A – Outreach consists of additional education and engagement with the property <br />owners which would include additional Open House events, Steering Committee meetings, <br />and one-on-one stakeholder meetings. The Service Plan would also be finalized during this <br />period. Phase 2A is recommended to take approximately four months to complete, at which <br />point it will be determined if enough support has been generated for the PBID formation, which <br />Civitas recommends being 30-40 percent of the assessed value from property owners. <br /> <br />The second part, Phase 2B – Formation would take six months to complete and include the <br />following steps: <br />1. Develop, review and approval of Management District Plan (MDP) <br />The Steering Committee and City staff will use the finalized Service Plan as the basis for the <br />MDP. The final MDP, Engineer’s Report and Petition will be approved. <br />2. Hold the Petition Drive <br />The Petition Drive must obtain Greater than 50 percent in signatures, representing the <br />assessment value to form the PBID. The City Council would sign the Petition and Ballot for <br />City-owned properties. <br />3. Initial Hearing at City Council Meeting <br />The City Council would adopt a Resolution of Intention to hold an initial hearing. The ballot and <br />notice of Public Hearing would be mailed to all property owners. <br />4. Public Hearing and Resolution of Formation <br />The City Council would hold a Public Hearing and adopt a Resolution of Formation, which <br />must be held at least 45 days after notice and ballot is mailed. <br /> <br />Based on the EVC’s recommendation to divide Phase 2 into two parts, a conservative timeline <br />was recommended for the City Council to consider: the original ambitious timeline presented to <br />the EVC outlined five months to complete the District renewal for the County tax roll in July <br />2025 to begin collection in January 2026. A EVC-proposed conservative timeline provides <br />additional outreach and education and would take approximately 10 months. With the <br />conservative timeline, the City could consider collecting the assessment for the first year and <br />the County assessment could begin in January 2026, otherwise the assessment would not <br />begin until January 2027 through the County tax roll. The Proposed Formation Timelines are