My WebLink
|
Help
|
About
|
Sign Out
ECONOMIC VITALITY COMMITTEE AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
ECONOMIC VITALITY
>
AGENDA PACKETS
>
2025
>
082125
>
ECONOMIC VITALITY COMMITTEE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 3:30:18 PM
Creation date
12/26/2025 3:29:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
has been officially signed off by Caltrans on January 17, 2020. The PSR-PDS is the <br />initial document required for the Caltrans project development process. <br /> • Status Under Construction <br /> • Next Steps/Details: This project will construct two traffic signals on Sunol <br />Boulevard, reconstruct the westbound to southbound loop <br />ramp, including the bridge section, and extend the <br />freeway merge section by 1000 feet to allow for a <br />smoother transition onto the freeway mainline. City <br />Council approved a contract amendment in June of 2020 <br />with AECOM to complete the next step of the Caltrans <br />project development phase, Preliminary Analysis & <br />Environmental Document (PA&ED). This phase will <br />require more in-depth analysis of traffic impacts and <br />environmental impacts due to project improvement <br />alternatives. This phase of the process is anticipated to <br />take 1year to complete (completion in July 2021). <br />Caltrans has requested an additional "Safety Analysis," <br />which has added 6 months to the project. The Draft <br />Environmental Document and Project Report are being <br />reviewed by Caltrans. The draft environmental document <br />was publicly circulated in Spring 2023. The PA&ED <br />phase was officially approved by Caltrans in August 2024. <br />AECOM amended its contract in September 2023 to <br />include project design and has begun exploratory field <br />work. PS&E is anticipated to last 16 months. The Project <br />is programmed to receive $6 million in State <br />Transportation Improvement Plan funds in FY 27/28. Soil <br />Testing and exploratory work to support PS&E have <br />begun. Staff was informed that the City was not awarded a <br />RAISE Federal Grant. The project is currently in project <br />design between 35-65%. <br /> • Applicant: City of Pleasanton <br /> • Staff Contact(s): Mike Tassano <br /> <br />30. Valley Ave at Northway Rd <br />Traffic Signal Installation <br />Transportation/Traffic Project <br /> This project will install a new traffic signal at the intersection of Valley Ave and <br />Northway Rd, next to Harvest Park Middle School. Curb extensions will be added to the <br />southeast and southwest corners to reduce crosswalk lengths. This location is the next <br />intersection in the signal priority list. The overall work will improve pedestrian/bicycle <br />safety and improve traffic operations. <br /> • Status Under Review <br /> • Next Steps/Details: The project was advertised in February 2024 and bids <br />were open on February 21, 2024. City Council Awarded <br />the construction contract to Columbia Electric on April
The URL can be used to link to this page
Your browser does not support the video tag.