My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Agenda Packet (2)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
05-14
>
Planning Commission Meeting Agenda Packet (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:16:17 PM
Creation date
12/30/2025 3:10:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />P24-0420 and P24-0421 PC-2025-10, May 14, 2025 <br /> <br />Identification (WDID) number, which must be printed on the grading and/or erosion <br />control plans. (Address this condition prior to permit issuance) <br /> <br />67. TEMPORARY TRAFFIC CONTROL: Work in the public right-of-way or publicly- <br />accessible easement areas require submittal, review, approval, and implementation of a <br />temporary traffic control plan. The plan shall be in writing and subject to review and <br />approval of the City’s Traffic Engineer. The plan must conform to the California Manual <br />on Uniform Traffic Control Devices (CA MUTCD), with specific emphasis on Part 6 <br />“Temporary Traffic Control”. <br /> <br />If Flaggers will be utilized, said personnel must be trained in the proper fundamentals of <br />flagging moving traffic before entering the right-of-way. The City may demand to see <br />evidence of said training before allowing said personnel into the right-of-way. <br /> <br />Any alterations to pedestrian paths of travel must conform to current standards for the <br />disabled. Any walking member of the public with a visual impairment (cane or guide <br />dog) must be escorted through the construction zone. (Address this condition during <br />construction) <br /> <br />68. HIGH VISIBILITY SAFETY APPAREL: All workers on foot who are exposed to the <br />hazard of vehicular traffic shall wear warning garments such as vests, jackets, or shirts <br />manufactured in accordance with the requirements of the American National Standards <br />Institute (ANSI)/International Safety Equipment Association (ISEA) 107-2004 <br />Performance Class 2, high visibility safety apparel and headwear, or any updates <br />adopted by Cal OSHA. During hours of darkness, warning garments shall be <br />retroreflective with visibility from a minimum 1,000 feet. (Address this condition during <br />construction) <br /> <br />69. EXCAVATION SAFETY: All excavations must be performed in conformance with <br />California Government Code Section 4216 et seq. No excavation shall occur until <br />proper notice is provided to Underground Service Alert (usanorth811.org) by calling <br />either 811 or 800-642-2444 at least 72-hours prior to the work so buried utilities can be <br />marked. All excavations shall be covered or barricaded to prevent entry when work is <br />inactive. Open excavations in the public right-of-way must be covered by skid-resistant <br />steel plates that are firmly affixed to the surface with leading edges ramped. <br />Excavations 5-feet and deeper require a protective system as defined by Cal-OSHA. If a <br />shoring system or trench boxes will be utilized as the protective system, said system <br />shall either be manufactured and installed according to manufacturer recommendations, <br />or designed by a registered professional engineer and installed according to approved <br />plans. No excavation shall be performed atop or adjacent to a high-risk facility until <br />authorized by the owner of the facility. High-risk facilities are defined as gas <br />transmission pipelines and hazardous liquid pipelines as regulated by the U.S. <br />Department of Transportation Pipeline and Hazardous Materials Safety Administration <br />(US DOT PHMSA) (Address this condition during construction) <br /> <br />70. POLLUTANT REDUCTION IN STORMWATER: At no time during construction of the <br />project shall pollutants be allowed to enter, clog, or contaminate storm drain pipe
The URL can be used to link to this page
Your browser does not support the video tag.