My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Agenda Packet (2)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
05-14
>
Planning Commission Meeting Agenda Packet (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:16:17 PM
Creation date
12/30/2025 3:10:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />P24-0420 and P24-0421 PC-2025-10, May 14, 2025 <br /> <br />networks or open stormwater channels in violation of Pleasanton Municipal Code <br />§9.14.080 et seq. The applicant shall contain all trash and debris for proper disposal to <br />authorized landfills or recyclers. Erosion control features shall be deployed during the <br />rainy season that extends from October 1st to April 15th each year, or any time rain is <br />forecast outside of this period. Best Management Practices (BMPs) shall be strictly <br />followed. Street sweepers must be employed if soil or debris is tracked onto the public <br />roads from vehicles exiting the site. Standard BMPs are available from the California <br />Stormwater Quality Association (CASQA), the United States Environmental Protection <br />Agency (EPA), Caltrans, and others. Notes and/or illustrations shall be added to the <br />plans that describe the BMPs to be utilized during construction. The use of <br />manufactured erosion control woven blankets and straw wattles that utilize plastic <br />monofilament netting is specifically prohibited. (Address this condition during <br />construction) <br /> <br />71. SWPPP REPORTING: Copies of any monitoring and/or sampling reports required by <br />the stormwater pollution prevention plan (SWPPP) and submitted by the Legally <br />Responsible Person (LRP) to the State of California’s SMARTS database shall also be <br />submitted to the City of Pleasanton inspector assigned to the project. The LRP shall <br />also submit to the City a copy of the required Annual Report no later than September 1st <br />of each year that construction is active or when erosion control features have been <br />deployed. The report must include a summary of all sampling and analysis performed <br />(Risk Levels 2 and 3 only), a log of all inspections performed, a summary of any <br />required corrective actions taken, and a summary of any violations. (Address this <br />condition during construction) <br /> <br />72. DUST CONTROL: Dust control measures must be employed during all phases of <br />construction to prevent airborne nuisance to neighboring properties. All stockpiles or <br />unused materials that can create dust shall be covered or removed. Exposed soil areas <br />shall be routinely watered until surfacing materials or landscaping is installed. Use of <br />dust palliatives shall conform to Caltrans Standard Specification Section 18. Any <br />damage caused by airborne dust to neighboring properties shall be cleaned with costs <br />paid by the applicant. If the applicant fails the address dust as directed by the City, the <br />City shall have the right to enter the property to effectuate the correction, with all costs <br />paid by the applicant or levied as a lien against the applicant’s property. (Address this <br />condition during construction) <br /> <br />73. PROPERTY NUISANCE: At no time during construction of the project shall the <br />condition of the property become a nuisance as defined in Pleasanton Municipal Code <br />§9.28.020. The City shall have the right to inspect the property for conditions that violate <br />the code standard. If a nuisance is found, the applicant shall immediately submit a plan <br />of correction. Depending on the severity of the nuisance, the City may suspend all <br />construction work until the condition is corrected. Any of the following conditions shall <br />be considered severe: Leaking chemicals that can cause environmental damage; open <br />excavations or any excavation deeper than 4 feet that lacks proper shoring; unsecured <br />materials that can fall to the ground causing damage or injury; open or exposed utilities <br />that could cause electrical shock or contamination of sewer, potable water systems, <br />groundwater wells, or storm drainage networks. If the applicant fails the address the
The URL can be used to link to this page
Your browser does not support the video tag.