Laserfiche WebLink
ISSUANCE & REVISIONS <br />All drawings and written material appearing herein constitute the <br />original and unpublished work of the architect and the same may <br />not be duplicated, used, or disclosed without the written consent of <br />the architect © Field Paoli <br />SHEET NUMBER: <br />JOB NO. <br />CHECKED BY <br />DRAWN BY <br />NOT FOR CONSTRUCTION <br />3/ <br />1 <br />4 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />1 <br />1 <br />: <br />4 <br />1 <br />: <br />5 <br />0 <br /> <br />A <br />M <br />G-0.0 <br />CONSTRUCTION DOCUMENTS <br />2348 <br />RYB / AFC <br />WL / CS <br />COVER SHEET <br />07 <br />. <br />1 <br />7 <br />. <br />2 <br />4 <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br /> <br />R <br />E <br />V <br />I <br />E <br />W <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />09 <br />. <br />0 <br />9 <br />. <br />2 <br />4 <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br /> <br />R <br />E <br />V <br />I <br />E <br />W <br /> <br />R <br />E <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />02 <br />. <br />0 <br />7 <br />. <br />2 <br />5 <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br /> <br />R <br />E <br />V <br />I <br />E <br />W <br /> <br />R <br />E <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />03 <br />. <br />1 <br />4 <br />. <br />2 <br />5 <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br /> <br />R <br />E <br />V <br />I <br />E <br />W <br /> <br />R <br />E <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br />GENERAL - PLANNING <br />G-0.0 COVER SHEET X X X X <br />G-0.4 ALTA SURVEY - FOR REFERENCE X X X <br />G-0.6 GHG CHECKLIST X X X <br />G-0.7 NEIGHBORHOOD CONTEXT X X X <br />G-0.9 SOLAR ACCESS / SHADOW STUDY X X X <br />G-1.0 ARCHITECTURAL SITE PLAN X X X X <br />CIVIL <br />C1.00 GRADING PLAN X X X X <br />C1.01 LANDSCAPE SECTIONS X X X X <br />C2.00 UTILITY PLAN X X X X <br />C3.00 STORMWATER MANAGEMENT X X X X <br />LANDSCAPE <br />L1.0 PRELIMINARY PLANTING PLAN X X X X <br />L2.0 PARKING LOT SHADE PLAN X X X X <br />DANVILLE BREWING <br />DESIGN REVIEW RESUBMITTAL <br />LOCATION MAPPROJECT DESCRIPTIONPROJECT DIRECTORY <br />APPLICABLE CODES <br />2023 CITY OF PLEASANTON CODE OF ORDIANCES <br />2022 CALIFORNIA BUILDING CODE W/ PLEASANTON AMENDMENTS (CBC) <br />2022 CALIFORNIA FIRE CODE W/ PLEASANTON AMENDMENTS (CFC) <br />2022 UNIFORM MECHANICAL CODE W/ PLEASANTON AMENDMENTS (IMC) <br />2022 UNIFORM PLUMBING CODE W/ PLEASANTON AMENDMENTS (IPC) <br />2022 NATIONAL ELECTRICAL CODE W/ PLEASANTON AMENDMENTS (EIC) <br />2022 CALIFORNIA GREEN BUILDING STANDARDS CODE W/ PLEASANTON AMENDMENTS (CALGREEN) <br />2010 AMERICANS WITH DISAILITIES ACT (COMPRISED OF THE 2004 ADAAG) (ADA) <br />2009 ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES (A117.1) <br />2024 NFPA 13, STANDARD FOR INSTALLATION OF SPRINKLER SYSEM (NFPA 13) <br />2022 NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE (NFPA 72) <br />The project site is located at the corner of Wyoming and Utah Streets with a site area of 50,866 square feet or 1.168 <br />acres. The proposed Danville Brewing Company project is a single 10,100 gross square foot one-story structure <br />consisting of a 5,700 square foot production brewery, 2,400 square foot brew pub, and a 2,000 square foot covered <br />outdoor biergarten. The building is set distant from both Wyoming and Utah Streets (41’-6” and 43’-0” respectively) to <br />maximize landscaping and outdoor use areas. <br />Hours of operation for the production brewery and the brew pub staff are Sunday-Thursday: 8:00am to 11:00pm and <br />Friday-Saturday: 8:00am to 12:00am. The maximum number of employees on-site is anticipated to be twelve (12) <br />employees. Opening hours of operation for the brew pub to the public are Sunday-Thursday: 11:00am to 10:00pm <br />and Friday-Saturday: 11:00am to 11:00pm. The maximum number of occupants inside the brew pub is one hundred <br />and twenty-one (121) and outside in the covered outdoor biergarten is one hundred (100). <br />The building design is a metal clad pre-engineered steel structure with an angled dynamic wall “cut” through the <br />South end creating the edge between the interior brew pub and the covered outdoor biergarten. This angled wall will <br />include large glass overhead garage doors and an indoor/outdoor bar to open the interior space to the outdoors. <br />Another large glass door opens out to the Wyoming Street landscape area as well. Windows along the West building <br />façade provide views to the brewing equipment within the structure. <br />The minimal metal clad gable roof form is kept “clean” with no rooftop equipment. All required mechanical and <br />electrical equipment will be within the structure or on grade. Provisions will be made for installation of future solar. <br />In general, detailing is kept to a minimum with sun shading on the windows facing Wyoming Street, projecting <br />canopies at all door openings, and an exposed concrete curb base around the building. <br />Site development will include outdoor areas along both Wyoming and Utah Streets for casual seating around firepits, <br />a stage platform, outdoor games (cornhole). The outdoor use areas are in the early stages of design and final <br />selection of outdoor design elements and furnishings is not complete. <br />The project will accommodate up to two food truck/food truck “container” trailer locations. One (1) relocatable food <br />truck "container" trailer will be placed on-site, located under the outdoor roof structure with quick-connect/disconnect <br />electrical, water and sanitary connections, if required. One (1) additional traditional food truck parking space is <br />available for a temporary on-site only food truck provider. No utility connections are provided for the food truck. Food <br />service would operate only during standard business hours. <br />Forty-five (45) off-street parking spaces are provided with access from the shared ingress/egress easement drive off <br />Utah Street (44 required). Up to (2) company delivery vans, each of which would fit in a standard parking space, <br />could be stored on-site. Deliveries and trash service are accommodated with the service drive along the North <br />property edge with a one-way out on to Wyoming Street. All delivery and distribution activities will occur on the North <br />end of the building, distant from Utah Street to the South, and shielded from Wyoming Street with a visual screen <br />fence enclosure. Anticipated operation-related supply delivery times would fall within these hours: Monday-Saturday: <br />8:00am to 4:00pm. <br />Extensive tree planting is provided to meet shading requirements and shield the building and outdoor uses from sun <br />exposure. Stormwater is addressed with three bioretention areas, one in the Northwest corner adjacent to the service <br />exit onto Wyoming Street, a second smaller area in the landscape strip in the parking area, and the primary <br />bioretention area serves as a landscape buffer between Utah Street and the outdoor use area and biergarten. A 6’-0” <br />high visual screening fence is placed around the service area to the North (rear yard) and a shorter 4’-0” open fencing <br />visual screening fence is placed along the Wyoming Street edge at the biergarten. <br />OWNER: <br />DANVILLE BREWING COMPANY <br />200 RAILROAD AVENUE A, DANVILLE, CA 94526 <br />MARCUS MAITA <br />MARCUS.MAITA05@GMAIL.COM <br />925.217.4172 <br />GENERAL CONTRACTOR: <br />ERIC F. ANDERSON, INC <br />1066 BEECHER STREET, SAN LEANDRO, CA 94577 <br />KRISTIN ANDERSON <br />KRISTIN@EFAINC.COM <br />510.430.8404 <br />CIVIL/ LANDSCAPE: <br />BKF ENGINEERS <br />980 9TH STREET, SUITE 2300, SACRAMENTO, CA 95814 <br />JIM MCCURDY <br />JMCCURDY@BKF.COM <br />916.556.5855 <br />SHEET INDEX <br />PROJECT SITE: <br />3595 UTAH STREET <br />PLEASANTON, CA 94566 <br />ARCHITECT: <br />FIELD PAOLI ARCHITECTS <br />711 MARKET STREET, 2ND FLOOR, SAN <br />FRANCISCO, CA 94103 <br />CHRISTEN SOARES <br />CFS@FIELDPAOLI.COM <br />415.788.6606 <br />MECHANICAL/ELECTRICAL/PLUMBING: <br />ACIES ENGINEERING <br />400 N. MC CARTHY BLVD, SUITE 250 <br />WILSON LEE <br />WILSON@ACIES.NET <br />408.522.5255 <br />DRY UTILITIES: <br />MILLENNIUM DESIGN AND CONSULTING, INC. <br />P.O. BOX 737, ALAMO, CA <br />ALFRED GIUSTI <br />ALFRED@JOINTUTILITY.COM <br />925.820.8502 <br />NO. DESCRIPTION DATE <br />DESIGN REVIEW SUBMITTAL 07.17.2024 <br />1 DESIGN REVIEW RESUBMITTAL 09.13.2024 <br />2 DESIGN REVIEW RESUBMITTAL 02.07.2025 <br />3 DESIGN REVIEW RESUBMITTAL 03.14.2025 <br />07 <br />. <br />1 <br />7 <br />. <br />2 <br />4 <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br /> <br />R <br />E <br />V <br />I <br />E <br />W <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />09 <br />. <br />0 <br />9 <br />. <br />2 <br />4 <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br /> <br />R <br />E <br />V <br />I <br />E <br />W <br /> <br />R <br />E <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />02 <br />. <br />0 <br />7 <br />. <br />2 <br />5 <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br /> <br />R <br />E <br />V <br />I <br />E <br />W <br /> <br />R <br />E <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />03 <br />. <br />1 <br />4 <br />. <br />2 <br />5 <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br /> <br />R <br />E <br />V <br />I <br />E <br />W <br /> <br />R <br />E <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br />ARCHITECTURAL - PLANNING <br />A-1.1 FLOOR PLAN X X X <br />A-2.1 REFLECTED CEILING PLAN X X X <br />A-2.2 ROOF PLAN X X X <br />A-3.0 BUILDING EXTERIOR ELEVATIONS PRESENTATION X X X <br />A-3.1 BUILDING EXTERIOR ELEVATIONS X X X <br />A-3.2 BUILDING SECTIONS X X X <br />A-3.3 PERSPECTIVE VIEWS X X X <br />A-4.1 WALL SECTIONS X X X <br />A-4.2 WALL SECTIONS X <br />A-5.1 ENLARGED PLAN & DETAILS - SERVICE ENCLOSURE X X X <br />A-8.0 SCHEMATIC DETAILS X X X <br />ELECTRICAL <br />E5.0 SINGLE LINE DIAGRAM AND SITE PLAN X X X <br />EP1.1 SITE PHOTOMETRIC PLAN X X X <br />EP1.2 FIXTURE SPECIFICATIONS X X X <br />PROJECT ADDRESS:3595 UTAH STREET PLEASANTON, CA 94566 <br />PARCEL NUMBER:946 - 4542 - 022 - 01 <br />ZONING: PUD-C (0.1010) <br />LOT SIZE:1.168 ACRES <br />BUILDING DATA:FULLY SPRINKLERED <br />REFER TO SHEET G1.0 SITE PLAN FOR EMERGENCY VEHICLE ACCESS REFERENCE. <br />PROJECT INFORMATION