P24-0532, 5555 W. Las Positas Boulevard . Planning Commission <br />4 of 14 <br />Fire Department would review and inspect the proposed East Wing addition for emergency <br />access. The City of Pleasanton would review and inspect the non-building elements of the <br />project, such as the site development’s grading, landscape and irrigation design, and parking <br />lot design. <br /> <br />PROJECT DESCRIPTION <br />The Proposed Building and Site Improvements <br />The project proposes an approximately 66,000 square-foot three-story hospital addition with a <br />maximum addition of a 24-bed nursing unit on the second floor referred to as the “East Wing <br />addition” (See Figure 2: Site Plan). <br /> <br />The building's exterior will feature a blend of brick, accent brick, exposed concrete columns, <br />metal panels, and low-emissivity glazing, harmonizing with the existing hospital and medical <br />office structures. Key architectural elements include a new metal canopy extending from the <br />Emergency Department entrance to the main hospital entrance, a stair tower at the north end <br />to define the building's massing, and a separate metal canopy sheltering five ambulance bays. <br /> <br />Other related aspects of the project include: <br /> <br />• Installation of emergency water and wastewater storage tanks <br />• Rooftop mechanical penthouse and rooftop equipment screening <br />• Partially reconfiguring the existing campus loop with corresponding pathway <br />connectivity (e.g. sidewalks) <br />• Provide a temporary ambulance canopy & parking area to support hospital operations <br />during construction. <br /> <br />The proposed project’s emergency water and wastewater storage tanks are required by the <br />State of California. The storage tanks include one approximately 3,308 square-foot portable <br />water storage tank located above grade within an enclosure, and three below-grade <br />wastewater storage/holding tanks ranging in size from 10,000 to 50,000 gallons. Additionally, <br />and as mentioned above, the project proposes site improvements consisting of adding new <br />landscape areas (approximately 29,414 square feet), sidewalks, and circulation improvements, <br />including reorientation of the campus loop, and modifying parking lot G (adjacent to the East <br />Wing). <br /> <br />The East Wing addition also proposes a two-phase approach with respect to the occupancy of <br />the new space, tied to the availability of replacement parking. Phase 1 consists of the <br />occupation and operation of floors one and three, with concurrent completion of the on-site <br />improvements as noted above. During Phase 1, the second floor (including the up to 24-bed <br />nursing unit) will be constructed as a shell space. Phase 2 involves the build-out of the second- <br />floor shelled space, at which point the project must provide 31 parking spaces prior to <br />operation (see the analysis section of this report for more details on parking). <br /> <br /> <br /> <br /> <br /> <br /> <br />