My WebLink
|
Help
|
About
|
Sign Out
Agenda Packet (7)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
05-28
>
Agenda Packet (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:27:07 PM
Creation date
12/30/2025 3:19:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P24-0532, 5555 W. Las Positas Boulevard . Planning Commission <br />6 of 14 <br />Construction Phasing <br />The proposed project includes a construction schedule that anticipates the work to be <br />completed in approximately 4 1/2 years. The preliminary phasing includes make-ready work <br />(e.g., rerouting of existing underground utilities, reconfiguring the existing campus loop, <br />constructing a temporary ambulance canopy, etc.), demolition, construction of the new East <br />Wing addition, and renovation of the existing Emergency Department. <br /> <br />To maintain ambulance operational services intact during the make-ready work, a temporary <br />ambulance parking location with a canopy is included. Located south of the existing Central <br />Utility Plant, the proposed location of the temporary ambulance bay is in the same vicinity as <br />the existing bay. Refer to Figure 4 below regarding the temporary ambulance canopy/parking <br />area. <br /> <br />Figure 4: Temporary Ambulance Parking and Canopy <br /> <br /> <br /> <br /> <br />Please refer to the attached narrative in Exhibit B for additional information regarding the <br />construction schedule and phasing.
The URL can be used to link to this page
Your browser does not support the video tag.