My WebLink
|
Help
|
About
|
Sign Out
Agenda Packet (7)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
05-28
>
Agenda Packet (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:27:07 PM
Creation date
12/30/2025 3:19:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P24-0532, 5555 W. Las Positas Boulevard . Planning Commission <br />14 of 14 <br />(282,325 square feet (existing) + 66,000 square feet (addition)), which is 139,675 square feet <br />less than the 488,000 square feet originally approved in the PUD Master Site Plan. The <br />reconfiguration of the internal campus loop drive and the addition of water and waste water <br />storage tanks and other site improvements are related facilities within the scope of the <br />previously approved IS/ND. The City is not required to prepare a subsequent EIR or <br />subsequent ND unless: 1) there are substantial changes to the project; 2) there are substantial <br />changes in the project’s circumstances or 3) new information that could not have been known <br />at the time the ND was adopted becomes available and such changes or new information <br />require major revisions to the previous ND due to new significant effects or a substantial <br />increase in the severity of previously identified significant effects(Public Resources Code <br />Section 21166; Guidelines Section 15162). There are no substantial changes to the project or <br />the circumstances under which the project is being undertaken that involve new significant <br />environmental effects or substantially increase the severity of previously identified impacts. <br />The proposed project is within the scope of the square footage and nature of facilities analyzed <br />in the IS/ND and approved under PUD-86-11. Furthermore, there is no new information of <br />substantial importance that was unknown at the time the City Council adopted the IS/ND <br />regarding the project or its effects. Therefore, no new environmental document is required. <br /> <br />SUMMARY/CONCLUSION <br />Staff has reviewed the project proposal and finds it consistent with the applicable PUD <br />development plan and City regulations. The building design is considered attractive, and the <br />architectural style, finish colors, and materials will complement the surrounding development <br />and conform to the Master Plan, as specified in PUD-86-11 and the Design Review <br />requirements. <br /> <br />Primary Author: Diego Mora, Associate Planner, 925-931-5618 or dmora@cityofpleasantonca.gov. <br /> <br />Reviewed/Approved By: <br />Eric Luchini, Senior Planner <br />Melinda Denis, Planning and Permit Center Manager/Deputy Director of Community Development <br />Ellen Clark, Director of Community Development <br />Kim Cilley, Assistant City Attorney
The URL can be used to link to this page
Your browser does not support the video tag.