My WebLink
|
Help
|
About
|
Sign Out
Agenda Packet (7)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
05-28
>
Agenda Packet (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:27:07 PM
Creation date
12/30/2025 3:19:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SHC Tri-Valley East Wing Hospital Addition <br />Design Review Application – Project Narrative <br />TAYLOR DESIGN – 6370.101 <br /> <br />4 <br /> <br />PROJECT SUMMARY <br />Stanford Health Care (SHC) Tri-Valley Hospital is a medical center complex at the northwest corner of the <br />intersection between W. Las Positas Boulevard and Santa Rita Road in North Pleasanton, California. It is a <br />Planned Unit Development (PUD) – Public and Institutional District. Since its integration with Stanford Health <br />Care (SHC) in 2015, Stanford Health Care Tri-Valley (SHC-TV) has been growing in its role as an essential <br />presence in Pleasanton and the greater area. <br />The original PUD application for SHC Tri-Valley (formerly Valleycare Medical Center) was approved in 1986, <br />which allowed for phased development of an approximately 488,000 SF medical center complex. The allowable <br />site capacity for this site is as follows: <br />Allowable Site Capacity within 1986 PUD Limits <br />Building Existing Floor Area <br />(SF) <br />Net Change <br />(SF) <br />Future Floor Area <br />(SF) <br />5565 MOB 45,000 45,000 <br />5575 MOB 45,000 45,000 <br />Main Hospital + West Wing 174,000 174,000 <br />ASSB (Lab + Pharmacy) 11,500 11,500 <br />Central Utility Plant (CUP) 6,825 6,825 <br />Proposed East Wing 66,000 66,000 <br />Future Buildings / Additional <br />Allowable Area <br /> 139,675 <br />TOTAL 282,325 66,000 488,000 <br />This project's purpose is to build a new three-story, approximately 66,000 square foot hospital addition at the <br />east side of the existing SHC Tri-Valley Hospital located at 5555 W. Las Positas Boulevard in Pleasanton, <br />California. <br />SHC Tri-Valley has seen increased demand for emergency services since 2020. Currently, there is a deficiency of <br />approximately 18,000 DGSF total. Projected emergency room volumes are expected to increase by <br />approximately 20% within the next ten years. <br />To address the growing needs of the community, the first-floor level will expand the existing Emergency <br />Department to a total of 42 examination and treatment locations including new waiting, registration, triage, <br />security vestibule, ambulance parking, staff lounge with outdoor staff patio, and support spaces. Approximately <br />1/3 of the existing Emergency Department will also be renovated with the remainder of the Emergency <br />Department cosmetically refreshed. <br />The second-floor level will be designed as a shell space to accommodate a potential 24-bed nursing unit (Phase <br />2) to support future inpatient volume. The Phase 2 build-out of the shelled space will include another 31 parking <br />stalls in addition to the 989 parking stalls provided in the current phase. In addition to the potential nursing unit, <br />the second-floor level will include two Labor and Delivery rooms that will replace two existing rooms displaced <br />by the connection for the new hospital addition. <br />The existing Lab, Pharmacy and Sterile Processing Department are undersized relative to current needs and SHC <br />Tri-Valley intends to combine code required space with functional needs housed in the existing Ancillary
The URL can be used to link to this page
Your browser does not support the video tag.