My WebLink
|
Help
|
About
|
Sign Out
Agenda Packet (7)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
05-28
>
Agenda Packet (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:27:07 PM
Creation date
12/30/2025 3:19:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SHC Tri-Valley East Wing Hospital Addition <br />Design Review Application – Project Narrative <br />TAYLOR DESIGN – 6370.101 <br /> <br />17 <br /> <br />f. Seismic bracing and overhead utilities <br />g. Fire alarm and fire sprinkler protection <br />6. Increment 4: Tenant Improvements – Existing Emergency Department and Sterile Processing <br />Department <br />a. Renovation of existing Emergency Department <br />b. Backfill of existing Sterile Processing Department (SPD) <br />The hospital campus is also required to be brought up to OSHPD requirements for seismic compliance by <br />January 1, 2030. In addition to the permit submittal pages described above, the following submittals will be <br />required to comply with 2030 seismic compliance requirements: <br />1. SPC upgrades to portion of existing arcade canopy near existing emergency department. <br />2. NPC-5 potable water storage tanks and wastewater storage tanks required to provide 72-hour capacity <br />during a major seismic event. <br />3. Water Rationing Plan. <br />4. New emergency generator and fuel tank. <br />
The URL can be used to link to this page
Your browser does not support the video tag.