Laserfiche WebLink
SHC Tri-Valley East Wing Hospital Addition <br />Design Review Application – Project Narrative <br />TAYLOR DESIGN – 6370.101 <br /> <br />16 <br /> <br />PERMITTING <br />Certain aspects of the East Wing Hospital Addition project will be submitted to the City of Pleasanton for review <br />during the permit review process with other aspects under jurisdiction and review by the California Office of <br />Statewide Planning and Development (OSHPD). California Application Notice (CAN) 2-0, revised January 10, <br />2017, Code Section 7-103 outlines components of this project that will be under OSHPD jurisdiction and those <br />that will be under local or other jurisdictions. In addition to CAN-2-0, OSHPD Advisory Guide Series – A9 provides <br />clarification of sitework under OSHPD jurisdiction vs. local jurisdiction. <br />OSHPD is the enforcing agency for OSHPD 1 health facilities as specified and stated in California Building Code <br />Section 1.10. While having jurisdiction as the “fire code official”, OSHPD does not have a “fire department” with <br />fire-fighting apparatus. It is therefore OSHPD policy to work closely with local fire departments regarding many <br />aspects of fire and life safety relative to buildings under its jurisdiction. <br />The City of Pleasanton retains jurisdiction, as the enforcing agency, with respect to location of the structure(s) <br />on the property, building height and massing, landscaping, grading or site work (except work associated with <br />construction of buildings under OSHPD jurisdiction), parking lot construction, and the general aesthetics of the <br />site or building. <br />The following aspects of the project will be submitted to the Office of Statewide Health Planning and <br />Development (OSHPD) for permit approvals as part of an incremental review process: <br />1. Geotechnical Report <br />2. OSHPD Functional Program <br />3. Increment 1: Make Ready, Sitework <br />a. New electrical infrastructure <br />b. Relocation of underground utility infrastructure serving the hospital building <br />c. Site work <br />d. Temporary exiting and access plans <br />e. Temporary construction barriers <br />f. Selective demolition (site demolition, existing ambulance canopy, existing ambulance <br />vestibule) <br />g. Temporary ambulance canopy, fire sprinkler protection, lighting <br />4. Increment 2: Core and Shell: <br />a. Footings and foundations <br />b. Building superstructure <br />c. Building envelope <br />d. Elevator and mechanical, electrical, plumbing shafts <br />e. Mechanical, electrical and information technology rooms <br />5. Increment 3: Tenant Improvements – New East Wing Hospital Addition: <br />a. Phasing of temporary wall removal at existing hospital building <br />b. New East Wing Hospital Addition <br />c. Tie-ins at first and second floor levels <br />d. Labor, Delivery, Recovery and Post-partum rooms at second floor <br />e. ADA, exiting plans, FF&E