|
L.O.W.L.O.W.
<br />PROPERTY LINE
<br />L.O.W.
<br />L.O.W.
<br />L.O.W.
<br />L.O.W.
<br />L.O.W.--PROJECT LOCATION
<br />A N D R E W S D R
<br />OLD SANTA RITA ROAD
<br />SANTA RITA ROAD
<br />EAST WING ADDITION
<br />AREA OF WORK (CROSSHATCH)
<br />WEST WING ADDITION
<br />MEDICAL OFFICE BUILDING
<br />NON-OSHPD, FULLY SPRINKLERED
<br />3 STORIES
<br />OSHPD BLDG 03 (BLDG-02534)
<br />TYPE 1-A, FULLY SPRINKLERED
<br />3 STORIES, SPC-5 / NPC-4
<br />2000-HS973195
<br />MAIN HOSPITAL BUILDING
<br />OSHPD BLDG 01 (BLDG-02532)
<br />TYPE 1-A, FULLY SPRINKLERED
<br />2 STORIES, SPC-3 / NPC-2
<br />1998-HS870001
<br />1991-HF880029
<br />ANCILLARY SERVICES
<br />SUPPORT BUILDING (ASSB)
<br />NON-OSHPD, FULLY SPRINKLERED
<br />1 STORY
<br />CENTRAL UTILITY PLANT (CUP)
<br />OSHPD BLDG 02 (BLDG-02533)
<br />TYPE 1-A, FULLY SPRINKLERED
<br />2 STORIES, SPC-5 / NPC-2 HF890219
<br />2
<br />SHEET NUMBER
<br />SHEET TITLE
<br />H
<br />1
<br />REVISION SCHEDULE
<br />AGENCY APPROVAL
<br />NO.REVISION NAME DATE:
<br />DESIGN PROFESSIONAL STAMP
<br />ARCHITECT PROJECT NO:
<br />PROJECT INFORMATION
<br />FACILITY NAME:
<br />FACILITY ADDRESS:
<br />OWNER PROJECT NUMBER:
<br />AUTHORITY HAVING JURISDICTION:
<br />AGENCY FACILITY NUMBER:
<br />AGENCY BUILDING NUMBER:
<br />AGENCY PROJECT NUMBER:
<br />2 3 4 5 6 7 8 9 10
<br />1 2 3 4 5 6 7 8 9 10
<br />G
<br />F
<br />E
<br />D
<br />C
<br />B
<br />A
<br />H
<br />G
<br />F
<br />E
<br />C
<br />B
<br />A
<br />PROJECT INFORMATION PROJECT TEAM
<br />OWNER
<br />ARCHITECT
<br />STRUCTURAL ENGINEER
<br />MECHANICAL ENGINEER
<br />PLUMBING ENGINEER
<br />ELECTRICAL ENGINEER
<br />CIVIL ENGINEER
<br />AUTHORITIES HAVING JURISDICTION (AHJ)
<br />PROJECT INFORMATION
<br />CONSULTANT
<br />D
<br />FI
<br />L
<br />E
<br />
<br />N
<br />A
<br />M
<br />E
<br />:
<br />©
<br />TA
<br />Y
<br />L
<br />O
<br />R
<br />
<br />&
<br />
<br />A
<br />S
<br />S
<br />O
<br />C
<br />I
<br />A
<br />T
<br />E
<br />S
<br />
<br />A
<br />R
<br />C
<br />H
<br />I
<br />T
<br />E
<br />C
<br />T
<br />S
<br />.
<br />
<br />I
<br />F
<br />
<br />T
<br />H
<br />I
<br />S
<br />
<br />D
<br />R
<br />A
<br />W
<br />I
<br />N
<br />G
<br />
<br />I
<br />S
<br />
<br />NO
<br />T
<br />
<br />3
<br />0
<br />"
<br />x
<br />4
<br />2
<br />"
<br />
<br />I
<br />T
<br />
<br />H
<br />A
<br />S
<br />
<br />B
<br />E
<br />E
<br />N
<br />
<br />M
<br />O
<br />D
<br />I
<br />F
<br />I
<br />E
<br />D
<br />LOW VOLTAGE
<br />LANDSCAPE MEDICAL EQUIPMENT (BIM)
<br />SIGNAGE SPECIALTY CONSULTANT - LAB
<br />SPECIALTY CONSULTANT - PHARMACY,
<br />SPD, VERTICAL TRANSPORTATION
<br />RHAA
<br />225 MILLER AVE
<br />MILL VALLEY, CA 94941
<br />MAIN CONTACT: MANUELA KING
<br />PHONE: (415) 383-7900
<br />EMAIL: MANUELA@RHAA.COM
<br />ONE-EQ
<br />1717 PACIFIC AVE
<br />DALLAS, TX 75201
<br />MAIN CONTACT: IRENE BICKELL
<br />PHONE: (213) 633-1100
<br />EMAIL: IRENE.BICKELL@ONE-EQ.COM
<br />P R E L I M I N A R Y :
<br />N O T F O R
<br />C O N S T R U C T I O N
<br />LOCATION AND ZONING
<br />BUILDING INFORMATION
<br />4/
<br />2
<br />2
<br />/
<br />2
<br />0
<br />2
<br />5
<br />
<br />1
<br />0
<br />:
<br />2
<br />5
<br />:
<br />3
<br />1
<br />
<br />A
<br />M
<br />A
<br />u
<br />t
<br />o
<br />d
<br />e
<br />s
<br />k
<br />
<br />D
<br />o
<br />c
<br />s
<br />:
<br />/
<br />/
<br />6
<br />3
<br />7
<br />0
<br />-
<br />S
<br />H
<br />C
<br />-
<br />T
<br />V
<br />
<br />E
<br />
<br />Wi
<br />n
<br />g
<br />
<br />H
<br />o
<br />s
<br />p
<br />i
<br />t
<br />a
<br />l
<br />
<br />A
<br />d
<br />d
<br />i
<br />t
<br />i
<br />o
<br />n
<br />/
<br />6
<br />3
<br />7
<br />0
<br />-
<br />S
<br />H
<br />C
<br />-
<br />T
<br />V
<br />
<br />E
<br />
<br />W
<br />i
<br />n
<br />g
<br />
<br />H
<br />o
<br />s
<br />p
<br />i
<br />t
<br />a
<br />l
<br />
<br />Ad
<br />d
<br />i
<br />t
<br />i
<br />o
<br />n
<br />-
<br />E
<br />n
<br />t
<br />i
<br />t
<br />l
<br />e
<br />m
<br />e
<br />n
<br />t
<br />s
<br />-
<br />R
<br />2
<br />4
<br />.
<br />r
<br />v
<br />t
<br />G-01
<br />2022514
<br />6370.101
<br />5555 WEST LAS POSITAS BLVD
<br />PLEASANTON, CA 94588
<br />STANFORD HEALTH CARE
<br />TRI-VALLEY
<br />East Wing Hospital Addition
<br />CITY OF PLEASANTON
<br />16632
<br />TBD
<br />TBD
<br />COVER SHEET
<br />ISSUE DATE: 08/23/2024
<br />STANFORD HEALTH CARE - TRI-VALLEY
<br />STANFORD HEALTH CARE TRI-VALLEY
<br />66 WILLOW PLACE
<br />MENLO PARK, CA 94025
<br />CONTACT: MOLLY SWENSON
<br />PHONE: (650) 400-1048
<br />EMAIL: MSWENSON@STANFORDHEALTHCARE.ORG
<br />WEBSITE: WWW.STANFORDHEALTHCARE.ORG
<br />TAYLOR DESIGN
<br />550 MONTGOMERY STREET, SUITE 925
<br />SAN FRANCISCO, CA 94111
<br />MAIN CONTACT: JOHN AMANAT
<br />PHONE: (415) 857-8041
<br />EMAIL: JAMANAT@WEARETAYLOR.COM
<br />DEGENKOLB ENGINEERS
<br />601 12 STREET, SUITE 400
<br />OAKLAND, CA 94607
<br />MAIN CONTACT: JAMES LIU
<br />PHONE: (510) 250-1210
<br />EMAIL: JLIU@DEGENKOLB.COM
<br />GAYNER ENGINEERS
<br />1133 POST STREET
<br />SAN FRANCISCO, CA 94109
<br />MAIN CONTACT: WARREN CHENG
<br />PHONE: (415) 474-9500
<br />EMAIL: WARREN@GAYNERENGINEERS.COM
<br />GAYNER ENGINEERS
<br />1133 POST STREET
<br />SAN FRANCISCO, CA 94109
<br />MAIN CONTACT: CYNTHIA CHENG
<br />PHONE: (415) 474-9500
<br />EMAIL: CYNTHIA@GAYNERENGINEERS.COM
<br />GAYNER ENGINEERS
<br />1133 POST STREET
<br />SAN FRANCISCO, CA 94109
<br />MAIN CONTACT: HELEN WONG
<br />PHONE: (415) 474-9500
<br />EMAIL: HELEN@GAYNERENGINEERS.COM
<br />BKF
<br />980 9TH STREET, SUITE 2300
<br />SACRAMENTO, CA 95814
<br />MAIN CONTACT: JIM MCCURDY
<br />PHONE: (916) 556-5855
<br />EMAIL: JMCCURDY@BKF.COM
<br />PAE CONSULTING ENGINEERS, INC.
<br />48 GOLDEN GATE AVE
<br />SAN FRANCISCO, CA 94102
<br />CONTACT: STEVE KELLY
<br />PHONE: (415) 544-7500
<br />EMAIL: STEVE.KELLY@PAE-ENGINEERS.COM
<br />East Wing Hospital Addition
<br />PLANNING: CITY OF PLEASANTON
<br />FIRE DISTRICT: LIVERMORE - PLEASANTON FIRE DEPARTMENT
<br />PLAN REVIEW/BUILDING PERMIT: CITY OF PLEASANTON
<br />STANFORD HEALTH CARE TRI-VALLEY
<br />PACKAGE ISSUANCE: DESIGN REVIEW SUBMITTAL
<br />ACCUMEN, INC.
<br />3333 HAYDEN ROAD, SUITE 1
<br />SCOTTSDALE, AZ 85261
<br />CONTACT: KIMBERLY ZUNKER
<br />PHONE: (940) 257-8770
<br />EMAIL: KZUNKER@ACCUMEN.COM
<br />ST. ONGE
<br />1400 WILLIAMS ROAD
<br />YORK, PA 17402
<br />CONTACT:HUE ROACH
<br />PHONE: (717) 840-8181
<br />EMAIL: HROACH@STONGE.COM
<br />WEIDNER
<br />5001 24TH STREET
<br />SACRAMENTO, CA 95822
<br />CONTACT: BRENT RECTOR
<br />PHONE: (916) 508-1546
<br />EMAIL: BRENTR@WEIDNERCA.COM
<br />ADDRESS: 5555 WEST LAS POSITAS BLVD
<br />PLEASANTON, CA 94588
<br />ASSESSOR’S PARCEL NUMBER: APN 946-3200-29-01, APN 946-3200-35-02, APN 946-3200-36
<br />ZONING DISTRICT(S): PUD-P-I (PUBLIC &INSTITUTIONAL)
<br />EXISTING USE: INSTITUTIONAL GROUP I-2 HOSPITAL
<br />PROPOSED USE: INSTITUTIONAL GROUP I-2 HOSPITAL
<br />EXISTING BUILDING OCCUPANCY: INSTITUTIONAL GROUP I-2 HOSPITAL
<br />PROPOSED BUILDING OCCUPANCY: INSTITUTIONAL GROUP I-2 HOSPITAL
<br />EXISTING BUILDING HEIGHT: 49' - 0 3/4"
<br />PROPOSED BUILDING HEIGHT: 65' - 0" , INCLUDING PENTHOUSE
<br />EXISTING STORIES ABOVE GRADE PLANE: SEE TABLE BELOW (ALLOWABLE SITE CAPACITY WITHIN 1986 PUD LIMITS)
<br />PROPOSED STORIES ABOVE GRADE PLANE: THREE STORIES ABOVE GRADE PLUS A MECHANICAL PENTHOUSE
<br />EXISTING BUILDING AREA: SEE TABLE BELOW (ALLOWABLE SITE CAPACITY WITHIN 1986 PUD LIMITS)
<br />BUILDING AREA (AS DESCRIBED PER CBC SECTION 202): 62,000 SF
<br />TYPE OF CONSTRUCTION: TYPE 1-A, FULLY SPRINKLERED
<br />FIRE SPRINKLER COVERAGE: FULL
<br />VICINITY MAP
<br />FACILITY MAP
<br />APPLICABLE CODES AND STANDARDS
<br />1. THE CONTRACTOR SHALL NOTIFY THE DESIGN PROFESSIONAL OF RECORD IN RESPONSIBLE
<br />CHARGE WHERE A CONFLICT OR DISCREPANCY OCCURS BETWEEN THE CONSTRUCTION
<br />DRAWINGS AND ANY OTHER PORTION OF THE CONSTRUCTION DOCUMENTS, FIELD CONDITIONS,
<br />OR WHERE ANY CONDITIONS ARISE NOT COVERED BY THESE DOCUMENTS WHEREIN WORK WILL
<br />NOT COMPLY WITH CODE REQUIREMENTS.
<br />2. THE INTENT OF THE PLANS AND SPECIFICATIONS ARE TO CONSTRUCT OR ALTER THE BUILDING
<br />IN ACCORDANCE WITH TITLE 24, CALIFORNIA CODE OF REGULATIONS.SHOULD ANY CONDITIONS
<br />DEVELOP NOT COVERED BY THE APPROVED PLANS AND SPECIFICATIONS WHEREIN THE
<br />FINISHED WORK WILL NOT COMPLY WITH TITLE 24, CALIFORNIA CODE OF REGULATIONS, A
<br />CHANGE ORDER DETAILING AND SPECIFYING THE REQUIRED WORK SHALL BE SUBMITTED TO
<br />AND APPROVED BY THE AUTHORITY HAVING JURISDICTION (AHJ) BEFORE PROCEEDING WITH THE
<br />WORK.
<br />3. WORK PERFORMED WITHOUT AHJ APPROVAL IS DONE SO AT SOLE RISK TO THE CONTRACTOR
<br />WHO SHALL PROVIDE FOR REMOVAL, REPLACEMENT, OR CORRECTION OF WORK AT NO
<br />INCREASED COST UNLESS APPROVED TO PROCEED BY THE OW NER.
<br />4. CONSTRUCTION, WORKMANSHIP AND MATERIAL SHALL CONFORM TO THE 2022 CALIFORNIA
<br />BUILDING STANDARDS CODE (CBSC).
<br />A. 2022 CALIFORNIA ADMINISTRATIVE CODE (CAC), PART 1, TITLE 24, CALIFORNIA CODE OF
<br />REGULATIONS (CCR)
<br />B. 2022 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24, CCR, BASED ON THE 2021
<br />INTERNATIONAL BUILDING CODE (IBC)
<br />C. 2022 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24, CCR, BASED ON THE 2020
<br />NATIONAL ELECTRICAL CODE (NEC)
<br />D. 2022 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24, CCR, BASED ON THE 2021
<br />UNIFORM MECHANICAL CODE (UMC)
<br />E. 2022 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24, CCR, BASED ON THE 2021
<br />UNIFORM PLUMBING CODE (UPC)
<br />F. 2022 CALIFORNIA ENERGY CODE (TITLE 24), PART 6, TITLE 24, CCR.
<br />G. 2022 CALIFORNIA FIRE CODE (CFC), PART 9, TITLE 24, CCR, BASED ON THE 2021
<br />INTERNATIONAL FIRE CODE (IFC)
<br />H. 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN), PART 11, TITLE 24,
<br />CCR, INCLUDING LOCAL JURISDICTION AMENDMENTS.
<br />I. CURRENT LOCAL JURISDICTION AMENDED CODES, REGULATIONS, AND ORDINANCES.
<br />NOTE: SEE OSHPD CAN 2-0 FOR EXTENTS OF LOCAL JURISDICTION FOR PROJECTS
<br />UNDER OSHPD-1 JURISDICTION.
<br />5. FOR HEALTHCARE OCCUPANCIES LICENSED UNDER A HOSPITAL’S CALIFORNIA DEPARTMENT OF
<br />PUBLIC HEALTH LICENSE; CONSTRUCTION, WORKMANSHIP AND MATERIAL SHALL CONFORM TO
<br />THE FOLLOWING:
<br />A. 2022 NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE
<br />B. 2012 NFPA 99 (HEALTH CARE FACILITY CODE) AND NFPA 101 -LIFE SAFETY CODE -
<br />APPLICABLE FOR PROJECTS WITH CMS PATIENTS (CENTERS FOR MEDICARE & MEDICAID).
<br />C. 2012 NFPA 101 -LIFE SAFETY CODE -APPLICABLE FOR A OCCUPANCY ASSEMBLY AREAS
<br />PER CBC 1030.6.2
<br />SHEET INDEX
<br />CITY OF PLEASANTON – SCREENING AROUND THE WATER TANKS, CONNECTION TO PUBLIC UTILITIES & SITE
<br /> CIRCULATION FOR EMERGENCY VEHICAL ACCESS, PARKING & LANDSCAPING.
<br />OSHPD – NEW NPC-5 COMPLIANT POTABLE WATER AND WASTEWATER STORAGE TANKS, EXISTING
<br /> HOSPITAL RENOVATIONS & EAST WING ADDITION .
<br />THE SECOND-FLOOR LEVEL WILL BE DESIGNED AS A SHELL SPACE TO ACCOMMODATE A POTENTIAL 24-BED
<br />NURSING UNIT (PHASE 2) TO SUPPORT FUTURE INPATIENT VOLUME.
<br />THE PROJECT’S SCOPE INCLUDES INSTALLATION OF NEW NPC-5 COMPLIANT POTABLE WATER AND WASTEWATER
<br />STORAGE TANKS FOR THE ENTIRE HOSPITAL.
<br />PROJECT AREA: 66,000 SF
<br />LEVEL 1 - 20,000 SF FULLY BUILT OUT
<br />LEVEL 2 - 23,200 SF SHELLED
<br />LEVEL 3 - 22,800 SF FULLY BUILT OUT
<br />PROJECT SCOPE OF WORK: THIS PROJECT'S SCOPE OF WORK IS TO BUILD A NEW THREE- STORY, APPROXIMATELY
<br />66,000 SQUARE FOOT HOSPITAL ADDITION AT THE EAST SIDE OF THE EXISTING SHC TRI-VALLEY HOSPITAL LOCATED
<br />AT 5555 W. LAS POSITAS BOULEVARD IN PLEASANTON, CALIFORNIA.
<br />BUILDING EXISTING
<br /> FLOOR AREA (SF)
<br />ALLOWABLE SITE CAPACITY WITHIN 1986 PUD LIMITS
<br />5565 MOB 45,000 -3 45,000
<br />5575 MOB 45,000 -3 45,000
<br />MAIN HOSPITAL + WEST WING 174,000 -1-3 174,000
<br />ASSB ( LAB + PHARMACY)11,500 -1 11,500
<br />CENTRAL UTILITY PLANT (CUP)6,825 -2 6,825
<br />PROPOSED EAST WING -66,000 3 66,000
<br />FUTURE BUILDINGS/ADDITIONAL
<br />ALLOWABLE AREA ---139,675
<br />TOTAL 282,325 66,000 - 488,000
<br />BUILDING INFORMATION
<br />PROPOSED (SF)
<br />FLOOR AREA
<br />FUTURE FLOOR
<br />AREA (SF)
<br />BLDG
<br />HEIGHT
<br />SHEET # SHEET NAME
<br />01 ARCHITECTURE GENERAL
<br />G-01 COVER SHEET
<br />G-60 AXON EXISTING
<br />G-61 AXON PROPOSED
<br />G-62 EXISTING SITE PLAN - SITE PHOTOS KEY
<br />G-63 EXISTING SITE CONDITIONS - SITE PHOTOS
<br />G-64 EXISTING SITE CONDITIONS - SITE PHOTOS
<br />G-65 EXISTING NEIGHBORHOOD PROPERTIES - SITE PHOTOS
<br />G-70 MATERIAL BOARD
<br />01.1 ARCHITECTURE
<br />A-10 OVERALL SITE PLAN - PROPOSED
<br />A-11 ENLARGED SITE PLAN A
<br />A-12 SITE CIRCULATION PLAN
<br />A-14 OVERALL PARKING SUMMARY
<br />A-16 LEVEL 1 OVERALL FLOOR PLAN
<br />A-17 LEVEL 2 OVERALL FLOOR PLAN
<br />A-18 LEVEL 3 OVERALL FLOOR PLAN
<br />A-19 OVERALL ROOF PLAN
<br />A-20 EXTERIOR ELEVATIONS
<br />A-21 EXTERIOR ELEVATIONS
<br />A-21-1 BUILDING SECTIONS
<br />A-22 NPC WATER TANKS - ELEVATIONS & SECTIONS
<br />A-23 SOLAR ACCESS/ SHADOW STUDY
<br />A-24 SOLAR ACCESS/ SHADOW STUDY
<br />05 ELECTRICAL
<br />ESK-1 SITE LIGHTING - NEW - PHOTOMETRICS
<br />ESK-2 SITE LIGHTING - EXISTING - PHOTOMETRICS
<br />ESK-3 LIGHT FIXTURE SCHEDULE
<br />06 CIVIL
<br />C1.0 EXISTING CONDITIONS
<br />C2.0 SURFACE IMPROVEMENTS PLAN
<br />C3.0 GRADING PLAN
<br />C4.0 UTILITY PLAN
<br />C4.1 UTILITY PLAN
<br />C5.0 STORMWATER CONTROL PLAN
<br />C6.0 EMERGENCY VEHICLE ACCESS PLAN
<br />C7.0 EASEMENT RELOCATION SITE PLAN
<br />C8.0 SLOPE CLASSIFICATION
<br />07 LANDSCAPE
<br />L-000 COVER SHEET
<br />L-001 TREE DISPOSITION PLAN
<br />L-002 TREE DISPOSITION PLAN - PLAN AREA B & C
<br />L-003 TREE INVENTORY AND PROTECTION RECOMMENDATIONS
<br />L-004 TREE INVENTORY AND PROTECTION RECOMMENDATIONS
<br />L-005 SURFACE PARKING SHADING PLAN
<br />L-006 HARDSCAPE SHADING PLAN
<br />L-007 LANDSCAPE SHADING PLAN
<br />L-100 ANNOTATED LANDSCAPE PLAN
<br />L-101 ANNOTATED LANDSCAPE PLAN - PLAN AREA B & C
<br />L-102 FURNISHINGS AND MATERIALS
<br />L-200 PLANTING SCHEDULE AND NOTES
<br />L-201 PLANTING PLAN
<br />L-202 PLANTING PLAN - PLAN AREA B & C
<br />L-203 PLANTING PALETTE
<br />08 SIGNAGE
<br />SI-01 COVER
<br />SI-02 SIGN LOCATIONS
<br />SI-03 SIGN DETAILS
<br />SI-04 SIGN DETAILS
<br />SI-05 SIGN DETAILS
<br />09 ARCHITECTURE (FOR REFERENCE ONLY)
<br />A-1573 EXTERIOR DETAILS - TEMPORARY AMBULANCE DROP OFF
<br />010 CIVIL (FOR REFERENCE ONLY)
<br />TOPO (SEE 5 SHEETS OF SUPPLEMENTAL DRAWINGS)
<br />Grand total: 56
<br />2
<br />2
<br />2
<br />PHASE 2 OF THE PROJECT (BUILDOUT OF THE 2ND FLOOR) WILL INCLUDE ANOTHER 31 PARKING STALLS IN ADDITION
<br />TO THE 989 PARKING STALLS PROVIDED IN THE CURRENT PHASE.
<br />4
<br />4
<br />4
<br />1 BACKCHECK #01 11/22/2024
<br />2 BACKCHECK #02 1/31/2025
<br />3 BACKCHECK #03 3/19/2025
<br />4 BACKCHECK #04 4/21/2025
|