Laserfiche WebLink
City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 42 <br />This annual project will restore proper street gutter <br />drainage run-off to protect the pavement from failure <br />due to saturated subgrade conditions. This project <br />will also reduce maintenance costs and help keep <br />city streets safe. <br />Annual Curb & Gutter & ADA Ramp <br />Project Number: FY509 <br />Transportation <br />This project is part of the annual resurfacing of city <br />streets, as various sections of curb and gutter must <br />be replaced along streets scheduled for resurfacing. <br />The Americans with Disabilities Act (ADA) requires <br />that all intersection ramp areas be upgraded to <br />current standards when the street is resurfaced. City <br />staff determines curb and gutter replacement loca- <br />tions through field inspections. <br />Department: Public Works - Engineering <br />Project Phase: Design & Construction <br />Total Budget:N/A - Annual Project <br />Project Description: <br />CIP Rating Score:Core <br />Project Funding <br />Project Justification: <br />Fund Description Fund #FY 2025/26 FY 2026/27 <br />27509 <br />FY 2027/28 <br />28509 <br />FY 2028/29 <br />29509 <br />FY 2029/30 <br />30509 <br />Gas Tax 160 -$900,000 $925,000 $900,000 $950,000