Laserfiche WebLink
43 City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 <br />Continuous sidewalk maintenance is essential to <br />ensure compliance with the Americans with Disabil- <br />ities Act (ADA). Failure to address identified irregu- <br />larities poses legal liability to the City and increases <br />the risk of pedestrian injuries. Proactively maintain- <br />ing sidewalks supports Pleasanton’s commitment <br />to accessibility, safety, and the overall quality of life <br />for its residents. <br />Annual Sidewalk & ADA Ramp <br />Project Number: FY512 <br />Transportation <br />This project involves dividing the city into inspection <br />zones, where sidewalks are assessed for offsets or irreg- <br />ularities that create potential tripping hazards. A scope <br />of work is developed from these inspections, and each <br />identified offset is addressed by cutting the surface to <br />make it level with the existing and surrounding pave- <br />ment. This approach ensures safe and accessible pedes- <br />trian pathways throughout the city. <br />Department: Public Works - O&M <br />Project Phase: Construction <br />Total Budget:N/A - Annual Project <br />Project Description: <br />CIP Rating Score:Core <br />Project Funding <br />Project Justification: <br />Fund Description Fund #FY 2025/26 <br />26512 <br />FY 2026/27 <br />27512 <br />FY 2027/28 <br />28512 <br />FY 2028/29 <br />29512 <br />FY 2029/30 <br />30512 <br />Gas Tax 160 $150,000 $155,000 $160,000 $165,000 $170,000