My WebLink
|
Help
|
About
|
Sign Out
Planning Commission meeting agenda packet 7-9-25
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
07-09
>
Planning Commission meeting agenda packet 7-9-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:39:07 PM
Creation date
12/30/2025 3:30:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1025
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Vineyard Avenue Residential Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br />46 <br /> <br />Pursuant to the BAAQMD CEQA Guidelines, odors are generally regarded as <br />an annoyance rather than a health hazard. Manifestations of a person’s <br />reaction to odors can range from psychological (e.g., irritation, anger, or <br />anxiety) to physiological (e.g., circulatory and respiratory effects, nausea, <br />vomiting, and headache). The presence of an odor impact is dependent on <br />several variables including: the nature of the odor source; the frequency of <br />odor generation; the intensity of odor; the distance of odor source to <br />sensitive receptors; wind direction; and sensitivity of the receptor. <br />Due to the subjective nature of odor impacts, the number of variables that <br />can influence the potential for an odor impact, and the variety of odor <br />sources, quantification of significant odor impacts is relatively difficult. Typical <br />odor-generating land uses include, but are not limited to, wastewater <br />treatment plants (WWTPs), landfills, and composting facilities. The proposed <br />project would not introduce any such land uses. <br />Construction activities often include diesel-fueled equipment and heavy- <br />duty diesel trucks, which can create odors associated with diesel fumes. Such <br />odors could be found to be objectionable. However, construction activities <br />would be temporary, and operation of construction equipment would be <br />regulated and intermittent. Project construction would also be required to <br />comply with all applicable BAAQMD rules and regulations, particularly <br />associated with permitting of air pollutant sources. The aforementioned <br />regulations would help to minimize air pollutant emissions, as well as any <br />associated odors. Accordingly, substantial objectionable odors would not <br />occur during construction activities or affect a substantial number of people. <br />In addition, the BAAQMD rules and regulations would act to reduce <br />construction-related dust, which would ensure that construction of the <br />proposed project does not result in substantial emissions of dust. Following <br />project construction, the project site would not include any exposed topsoil. <br />Thus, project operations would not include any substantial sources of dust. <br />As discussed in the AQ/GHG Assessment, the existing quarry is located <br />opposite Vineyard Avenue and extends well to the north. The quarry contains <br />multiple stationary sources of dust and particulate matter, such as the CEMEX <br />Pleasanton Concrete Plant and Granite Construction. However, the project <br />site is located at least 1,000 feet from the edge of the quarry. According to <br />the AQ/GHG Assessment, the major sources of emissions (such as crushing, <br />pulverizing, and transporting equipment) are located at even further <br />distances in the northern portions of the quarry, thereby increasing the <br />distance between the source of emissions and the proposed sensitive
The URL can be used to link to this page
Your browser does not support the video tag.