Laserfiche WebLink
City of Pleasanton—Vineyard Avenue Residential Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br />47 <br /> <br />receptors. Finally, according to the AQ/GHG Assessment, the wind through <br />the area predominantly towards the east-southeast, away from the site and <br />sensitive receptors. As a result, the quarry operations are not anticipated to <br />result in any substantial odors or dust emissions at the project site. <br />For the aforementioned reasons, construction and operation of the proposed <br />project would not result in emissions (such as those leading to odors) <br />adversely affecting a substantial number of people. Furthermore, given that <br />the proposed project is consistent with the type of residential development <br />anticipated for the site, emissions associated with construction and operation <br />of the proposed project have been anticipated and analyzed in the Housing <br />Element Update FEIR. Therefore, the proposed project would not result in any <br />peculiar effects, and further CEQA review would not be required for this <br />topic. <br />Conclusion <br />With regards to Air Quality, the consistency checklist demonstrates that: <br />1. No peculiar impacts related to the proposed project or its site have <br />been identified. <br />2. There are no potentially significant off-site and/or cumulative impacts <br />which were not discussed by the Housing Element Update FEIR. <br />3. No substantial new information has been identified which results in an <br />impact which is more severe than anticipated by the Housing Element <br />Update FEIR. <br />4. MM AIR-1a and MM AIR-1b from the Housing Element Update FEIR <br />would be required and would reduce potential impacts to below a <br />level of significance consistent with the analysis is the Housing Element <br />Update FEIR. <br /> <br />Mitigation Measures <br />Housing Element Update FEIR Mitigation Measures <br />MM AIR-1a Prior to the issuance of a grading or building permit, whichever is <br />sooner, the project applicant for a potential site for rezoning shall <br />submit an air quality construction plan detailing the proposed air <br />quality construction measures related to the project such as <br />construction phasing, construction equipment, and dust control <br />measures, and such plan shall be approved by the Director of