Laserfiche WebLink
City of Pleasanton—Vineyard Avenue Residential Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br />85 <br /> <br />that the potential for liquefaction and soil settlement is likely low, but <br />recommended that a confirmation boring be performed as part of the <br />design-level Geotechnical Investigation conducted as required by General <br />Plan policies, including Policies 2 and 5 within the Public Safety Element. <br />In addition, the CBSC, as adopted by the City in Section 20.08.010 of the <br />Pleasanton Municipal Code, provides standards to protect property and <br />public safety by regulating the design and construction of excavations, <br />foundations, building frames, retaining walls, and other building elements, <br />which would further reduce the potential for seismic-related ground failure, <br />including liquefaction. Compliance with the aforementioned uniformly <br />applicable development regulations would ensure that the potential for risks <br />related to liquefaction would be less than significant and the proposed <br />project would not result in any effects that would require further CEQA review <br />for this topic. <br />iv) Seismic-related Ground Failure, Including Landslides <br />Summary of Housing Element Update FEIR <br />As indicated in the Housing Element Update FEIR, aside from Sites 1 (Lester), <br />22 (Merritt), 23 (Sunol Boulevard), 24 (Sonoma Drive Area), and 26 (St. <br />Augustine), none of the potential sites for rezoning are located within a <br />rainfall-induced landslide hazard zone (Refer to Draft EIR Exhibit 3.6-5). <br />The Housing Element Update FEIR concluded that compliance with California <br />Building Standards Code, applicable Municipal Code requirements, as well <br />as goals, policies, and programs included as part of the General Plan, and <br />the Vineyard Avenue Corridor Specific Plan (as applicable) would protect <br />residents, structures, and infrastructure from potential substantial adverse <br />effects, including the risk of loss, injury or death involving landslides. Therefore, <br />it was concluded that impacts related to landslides at the programmatic <br />level would be less than significant. <br />Proposed Project Analysis and Conclusion <br />Seismically induced landslides are triggered by earthquake ground shaking. <br />The risk of landslide hazard is greatest in areas with steep, unstable slopes. <br />According to the Geotechnical Investigation Report, strong ground shaking <br />during a major earthquake on a nearby fault is likely to be felt at this site, but <br />the site is not mapped in a Zone of Earthquake Induced Landsliding by the <br />State. Based on the relatively flat nature of the site and not being mapped in <br />a Zone of Earthquake Induced Landsliding, the potential for earthquake <br />induced landsliding is low. Therefore, the findings of the Geotechnical