My WebLink
|
Help
|
About
|
Sign Out
Planning Commission meeting agenda packet 7-9-25
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
07-09
>
Planning Commission meeting agenda packet 7-9-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:39:07 PM
Creation date
12/30/2025 3:30:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1025
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Vineyard Avenue Residential Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br />86 <br /> <br />Investigation Report confirm the Housing Element Update FEIR’s conclusion <br />for the site. In addition, compliance with CBSC standards would reduce <br />impacts related to landslides to a less-than-significant level. Overall, impacts <br />related to landslides would be less than significant and the proposed project <br />would not result in any effects that would require further CEQA review for this <br />topic. <br />b) Soil Erosion or Topsoil Loss <br />Would the project: Result in substantial soil erosion or the loss of topsoil? <br />Summary of Housing Element Update FEIR <br />The Housing Element Update FEIR indicated that development consistent <br />with the Housing Element Update would involve construction activities such <br />as stockpiling, grading, excavation, paving, and other earth-disturbing <br />activities that could result in soil erosion or the loss of topsoil. Soil erosion is <br />dependent on individual site locations and conditions on-site during <br />construction. <br />The Housing Element Update FEIR concluded that, for construction activities <br />that disturb one or more acre of land surface, compliance with the National <br />Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater <br />Discharges Associated with Construction and Land Disturbance Activities <br />(Order No. 2012-0006-DWQ) would require development and implementation <br />of a Storm Water Pollution Prevention Plan (SWPPP). The SWPPP would result in <br />erosion and sediment controls, runoff water quality monitoring, proper waste <br />disposal, implementation of approved local plans, control of construction <br />sediment and erosion control measures, and identification of maintenance <br />responsibilities, as well as non-stormwater management controls. In addition, <br />compliance with California Building Standards Code, applicable Municipal <br />Code requirements, as well as goals, policies, and programs included as part <br />of the General Plan, and the Vineyard Avenue Corridor Specific Plan (as <br />applicable) would reduce potential soil erosion and loss of topsoil from <br />construction-related soil disturbance. As such, potential impacts related to <br />soil erosion and loss of topsoil would be reduced to less than significant levels. <br />Proposed Project Analysis and Conclusion <br />Issues related to erosion are discussed in Section X, Hydrology and Water <br />Quality, of this Consistency Checklist. As noted therein, the proposed project <br />would not result in substantial soil erosion or the loss of topsoil.
The URL can be used to link to this page
Your browser does not support the video tag.