My WebLink
|
Help
|
About
|
Sign Out
Planning Commission meeting agenda packet 7-9-25
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
07-09
>
Planning Commission meeting agenda packet 7-9-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:39:07 PM
Creation date
12/30/2025 3:30:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1025
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Vineyard Avenue Residential Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br />87 <br /> <br />c) Unstable Geologic Location <br />Would the project: Be located on a geologic unit or soil that is unstable, or that would <br />become unstable as a result of the project, and potentially result in <br />on- or off-site landsliding, lateral spreading, subsidence, <br />liquefaction, or collapse? <br />Summary of Housing Element Update FEIR <br />The Housing Element Update FEIR indicated that unstable geologic units or <br />soils, including geologic hazards, such as subsidence or collapse, are present. <br />As such, development consistent with the Housing Element Update could <br />occur within areas containing unstable geologic units or be located on soils <br />that are unstable or could become unstable from such development. <br />The Housing Element Update FEIR concluded that compliance with California <br />Building Standards Code, applicable Municipal Code requirements, as well <br />as goals, policies, and programs included as part of the General Plan, and <br />the Vineyard Avenue Corridor Specific Plan (as applicable) would ensure <br />that potential impacts associated with development on unstable geologic <br />units or unstable soils would be less than significant. <br />Proposed Project Analysis and Conclusion <br />Subsidence is the settlement of soils of very low density generally from either <br />oxidation of organic material, or desiccation and shrinkage, or both, <br />following drainage. Subsidence takes place gradually, usually over a period <br />of several years. As previously discussed, the project site contains <br />undocumented fill at the northern project site boundary, likely originating <br />from the grading of Vineyard Avenue. The Geotechnical Investigation Report <br />determined the undocumented fill would not significantly impact the <br />proposed project. <br />In addition, the CBSC provides standards to protect property and public <br />safety by regulating the design and construction of excavations, foundations, <br />building frames, and other building elements. Compliance with standard <br />construction regulations included in the CBSC would ensure that the <br />proposed project would not directly or indirectly cause potential substantial <br />adverse effects, including the risk of loss, injury, or death involving subsidence <br />or settlement. Furthermore, final building design and construction at the <br />project site would be completed in conformance with the recommendations <br />of a design-level Geotechnical Investigation. The City of Pleasanton Building <br />and Safety Division and Public Works would review all improvement plans to <br />ensure that all recommendations from the Geotechnical Investigation Report <br />are incorporated. The proposed project would be required to comply with all
The URL can be used to link to this page
Your browser does not support the video tag.