My WebLink
|
Help
|
About
|
Sign Out
Planning Commission meeting agenda packet 7-9-25
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
07-09
>
Planning Commission meeting agenda packet 7-9-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:39:07 PM
Creation date
12/30/2025 3:30:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1025
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Vineyard Avenue Residential Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br />89 <br /> <br />18-1B of the Uniform Building Code (1994), creating substantial direct or <br />indirect risks to life or property were adequately addressed in the Housing <br />Element Update FEIR, and the proposed project would not result in any <br />effects that would require further CEQA review for this topic. <br />e) Wastewater Disposal Systems <br />Would the project: Have soils incapable of supporting the use of septic tanks or other <br />alternative wastewater disposal systems where sewers are not <br />available? <br />Summary of Housing Element Update FEIR <br />The Housing Element Update FEIR indicated most of the potential sites for <br />rezoning are infill sites; thus, new development consistent with the Housing <br />Element Update would primarily occur on parcels that already contain <br />existing homes or businesses. As such, development consistent with the <br />Housing Element Update would be served by the existing sewer system, and <br />most new development would connect to existing sewer lines. However, <br />should any new development require the installation of septic tanks or <br />alternative wastewater disposal systems, the General Plan includes policies <br />and programs to ensure that any new development can be feasibly <br />constructed according to soil conditions. <br />The Housing Element Update Draft EIR concluded implementation of policies <br />and programs in the General Plan, as well as applicable Municipal Code <br />requirements, would ensure that new septic tanks or alternative wastewater <br />disposal systems are constructed on soils that can support such systems. <br />Therefore, the impacts would be less than significant. <br />Proposed Project Analysis and Conclusion <br />The proposed project would connect to existing City sewer services. Thus, the <br />construction or operation of septic tanks or other alternative wastewater <br />disposal systems is not included as part of the project. Therefore, the <br />proposed project would not result in any effects that would require further <br />CEQA review for this topic. <br />f) Destruction of Paleontological Resource or Unique Geologic Feature <br />Would the project: Directly or indirectly destroy a unique paleontological resource or <br />site or unique geologic feature? <br />Summary of Housing Element Update FEIR <br />The Housing Element Update FEIR indicated that the City is directly underlain <br />by Quaternary Alluvium, which is unlikely to contain vertebrate fossils.
The URL can be used to link to this page
Your browser does not support the video tag.