Laserfiche WebLink
City of Pleasanton—Vineyard Avenue Residential Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br />95 <br /> <br />strategy) by completing and submitting the CAP 2.0 CEQA GHG Emissions <br />Analysis Compliance Checklist. <br />The Housing Element Update FEIR concluded that the Housing Element <br />Update is consistent with the goals and policies of the CAP 2.0, as <br />applicable, and would support the State’s goals to reduce emissions by 40 <br />percent below 1990 levels by 2030 and to achieve carbon neutrality by 2045, <br />since the CAP 2.0 was adopted to support the achievement of those goals. <br />To ensure that future development projects consistent with the Housing <br />Element Update would be consistent with the CAP 2.0, future projects would <br />be required to individually demonstrate consistency with the CAP 2.0 as a <br />part of the City’s permitting process. The emissions anticipated to be <br />generated by development consistent with the Housing Element Update <br />would support the City’s GHG reduction goals outlined in the CAP 2.0. As <br />such, development consistent with the Housing Element Update would be <br />consistent with the CAP 2.0 for purposes of analysis under the BAAQMD <br />Thresholds of Significance. As such, impacts related to GHG emissions <br />generation and potential conflicts with a plan, policy, or regulation that <br />reduces emissions would be less than significant. <br />Proposed Project Analysis and Conclusion <br />The City of Pleasanton adopted an updated CAP 2.0 in February 2022, <br />subsequent to the adoption of the General Plan EIR. The CAP 2.0 includes <br />specific strategies and actions to reduce emissions to 4.11 MT CO2e per <br />capita by 2030 (70 percent below 1990 levels) and provide substantial <br />progress towards carbon neutrality by 2045. Pursuant to Section 15183.5 of <br />the CEQA Guidelines, a lead agency may determine that a project’s <br />incremental contribution to a cumulative effect is not cumulatively <br />considerable if the project complies with a previously adopted plan. The CAP <br />2.0 is considered a “qualified” GHG reduction strategy and provides CEQA <br />streamlining for future development that are subject to discretionary review <br />and trigger environmental review pursuant to the CEQA. Accordingly, a GHG <br />Emission Compliance Checklist (Compliance Checklist) was prepared for the <br />proposed project and is summarized below. The Compliance Checklist is <br />included as Attachment 4 to the AQ/GHG Assessment (Appendix A). <br />As discussed in the AQ/GHG Assessment, the proposed project would <br />include sufficient bicycle parking spaces in the proposed park and EV Ready <br />components in each of the proposed single-family residences to satisfy PA 8 <br />and PA 5, respectively, of the CAP 2.0. In addition, consistent with the <br />CALGreen Code and Strategy BE-1, the proposed project would not include