My WebLink
|
Help
|
About
|
Sign Out
Planning Commission meeting agenda packet 7-9-25
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
07-09
>
Planning Commission meeting agenda packet 7-9-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:39:07 PM
Creation date
12/30/2025 3:30:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1025
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Vineyard Avenue Residential Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br />101 <br /> <br />Construction activities at these sites would likely involve ground-disturbing <br />activities that could expose workers, the public, and the environment to <br />contaminated soil and groundwater, if present. <br />The Housing Element Update FEIR concluded that compliance with <br />applicable federal, State, and local laws, plans and regulations, including <br />the General Plan, Vineyard Avenue Corridor Specific Plan, Titles 8 and 17 of <br />the California Code of Regulations, California Division of Occupational <br />Health and Safety (Cal/OSHA) requirements, as well as implementation of <br />MM HAZ-2, which requires the preparation of a Phase I Environmental Site <br />Assessment (Phase I ESA) and Phase II ESA (as necessary) and completion of <br />any necessary remedial activities to be conducted under the oversight of the <br />appropriate regulatory agency, would provide public protection from <br />hazards associated with the use, transport, treatment, and disposal of <br />hazardous substances during construction and operation of development <br />consistent with the Housing Element Update. Therefore, impacts related to <br />upset and accident conditions involving the release of hazardous materials <br />into the environment would be less than significant with mitigation. <br />The Housing Element Update FEIR also indicated that several of the potential <br />development sites are located near identified contamination sources that <br />have not been fully remediated; in addition, several former hazardous waste <br />sites that have been fully remediated exist near potential development sites <br />(see Housing Element Update Draft EIR Table 3.8-1 and Exhibits 3.8-1a and <br />3.8-1b). <br />The Housing Element Update FEIR concluded that if a potential site for <br />rezoning is suspected to contain hazardous materials, further site <br />characterization and/or remediation work would be required to ensure that <br />construction activities would not expose people or the environment to <br />adverse effects, as required by MM HAZ-2. Therefore, with implementation of <br />MM HAZ-2 and compliance with applicable federal, State, and local laws, as <br />well as compliance with appliable plans and regulations, as enumerated in <br />more detail in Section 3.8, Hazards and Hazardous Materials, in the Housing <br />Element Update Draft EIR, impacts related to the creation of a hazard to the <br />public or environment would be less than significant. <br /> <br />Environmental Impact Report for the City of Pleasanton 2023-2031 (6th Cycle) Housing Element Update <br />Program – Dated April 2022 (State Clearinghouse Number: 2022040091). May 5.
The URL can be used to link to this page
Your browser does not support the video tag.