My WebLink
|
Help
|
About
|
Sign Out
Planning Commission meeting agenda packet 7-9-25
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
07-09
>
Planning Commission meeting agenda packet 7-9-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:39:07 PM
Creation date
12/30/2025 3:30:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1025
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Vineyard Avenue Residential Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br />102 <br /> <br />Proposed Project Analysis and Conclusion <br />The following discussion provides an analysis of potential hazards and <br />hazardous materials associated with upset or accident conditions related to <br />the proposed construction activities and existing on-site conditions. The <br />analysis is primarily based on the Phase I ESA prepared for the proposed <br />project by ENGEO. <br />Construction Activities <br />Construction activities associated with the proposed project would involve <br />the use of various products such as concrete, paints, and adhesives. In <br />addition, heavy-duty construction equipment would contain hydraulic fluid, <br />diesel fuel, and other petroleum products. Small quantities of such potentially <br />toxic substances would be used at the project site and transported to and <br />from the site during construction. However, the project contractor would be <br />required to comply with all California Health and Safety Codes and local <br />County ordinances regulating the handling, storage, and transportation of <br />hazardous and toxic materials. <br />Pursuant to California Health and Safety Code Section 25510(a), except as <br />provided in subdivision (b), the handler or an employee, authorized <br />representative, agent, or designee of a handler, shall, upon discovery, <br />immediately report any release or threatened release of a hazardous <br />material to the unified program agency (in the case of the proposed project, <br />the Livermore-Pleasanton Fire Department [LPFD]) in accordance with the <br />regulations. The handler or an employee, authorized representative, agent, <br />or designee of the handler shall provide all State, City, or County fire or public <br />health or safety personnel and emergency response personnel with access <br />to the handler's facilities. In the case of the proposed project, the contractor <br />is required to notify the LPFD in the event of an accidental release of a <br />hazardous material, who would then monitor the conditions and recommend <br />appropriate remediation measures. <br />Existing On-Site Hazardous Conditions <br />The purpose of the Phase I ESA was to review past and present land use <br />practices and activities at and near the project site for evidence of RECs that <br />could result in impacts to soil, soil vapor, surface water, and/or groundwater <br />at, beneath, or originating from the project site. As part of the process, the <br />Phase I ESA included review of historical documentation, aerial photography, <br />regulatory agency files, environmental sites radius reports, and site <br />reconnaissance. According to the American Society for Testing and Materials
The URL can be used to link to this page
Your browser does not support the video tag.