Laserfiche WebLink
City of Pleasanton—Vineyard Avenue Residential Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br />118 <br /> <br />development would be required to pay its fair share of the flood control <br />improvement costs. Therefore, impacts related to surface water and flooding <br />would be less than significant. <br />The Housing Element Update FEIR indicated that new development <br />consistent with the Housing Element Update could increase the total <br />impervious area and increase stormwater runoff, which could exceed <br />stormwater drainage facility capacity or create additional sources of <br />polluted runoff. <br />The Housing Element Update FEIR concluded that compliance with the <br />General Plan policies and programs would maximize infiltration and rainwater <br />retention, which would in turn reduce stormwater runoff. Additionally, all <br />future development consistent with the Housing Element Update would be <br />evaluated on a project-by-project basis for impacts to storm drain capacity. <br />Further, new development would be required to pay its fair share of the storm <br />drainage system improvement costs. Therefore, impacts related to <br />exceedances in stormwater drainage systems or the creation of substantial <br />additional sources of polluted runoff would be less than significant. <br />Proposed Project Analysis and Conclusion <br />During the early stages of construction activities, topsoil would be exposed <br />due to grading and excavation of the site. Prior to overlaying the ground with <br />impervious surfaces and structures, the potential exists for wind and water to <br />transport sediment and/or urban pollutants into stormwater runoff, which <br />could adversely affect water quality. <br />The SWRCB regulates stormwater discharges associated with construction <br />activities where clearing, grading, or excavation results in land disturbance of <br />one or more acres. The City’s NPDES permit requires applicants to show proof <br />of coverage under the State’s Construction General Permit prior to receipt of <br />any construction permits. The State’s Construction General Permit requires a <br />SWPPP to be prepared for the site. A SWPPP describes BMPs to control or <br />minimize pollutants from entering existing waters through stormwater flows, <br />and must address both grading and erosion impacts, as well as non-point <br />source pollution impacts. Because the proposed project would disturb an <br />area of land greater than one acre, the proposed project would be subject <br />to the requirements of the State’s Construction General Permit and, with <br />implementation of the required SWPPP and BMPs included therein, the <br />proposed project would not result in a violation of water quality standards <br />and/or degradation of water quality. Furthermore, the proposed project <br />would be required to comply with Chapter 9.14, Stormwater Management