My WebLink
|
Help
|
About
|
Sign Out
Planning Commission meeting agenda packet 7-9-25
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
07-09
>
Planning Commission meeting agenda packet 7-9-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:39:07 PM
Creation date
12/30/2025 3:30:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1025
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Vineyard Avenue Residential Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br />117 <br /> <br />Update FEIR, and the proposed project would not result in any effects that <br />would require further CEQA review for this topic. <br />c) Drainage Leading to Erosion/Siltation, Flooding, Additional Sources of Polluted <br />Runoff, or Impedance of Flood Flows <br />Would the project: Substantially alter the existing drainage pattern of the site or area, <br />including through the alteration of the course of a stream or river or <br />through the addition of impervious surfaces, in a manner which <br />would: <br />• result in substantial erosion or siltation on- or off-site; <br />• substantially increase the rate or amount of surface runoff in <br />a manner which would result in flooding on- or off-site; or <br />• create or contribute runoff water which would exceed the <br />capacity of existing or planned stormwater drainage <br />systems or provide substantial additional sources of polluted <br />runoff. <br />Summary of Housing Element Update FEIR <br />The Housing Element Update FEIR indicated that future development <br />consistent with the Housing Element Update would involve construction <br />activities such as stockpiling, grading, excavation, paving, and other earth- <br />disturbing activities. Loose and disturbed soils are more prone to erosion and <br />loss of topsoil by wind and water. This could result in an increase in <br />stormwater runoff and the potential to cause erosion or sedimentation in <br />drainage swales and creeks. <br />The Housing Element Update FEIR concluded that compliance with the <br />NPDES and SWPPP requirements and the policies and actions included in the <br />General Plan would ensure impacts related to erosion and siltation would be <br />less than significant. <br />The Housing Element Update FEIR indicated that future development <br />consistent with the Housing Element Update could increase the total <br />impervious area within the City and increase stormwater runoff, which could <br />result in flooding. <br />The Housing Element Update FEIR concluded that compliance with existing <br />regulations, the policies and actions included in the General Plan, and <br />adherence to the Municipal Code would maximize infiltration and rainwater <br />retention, which would in turn reduce stormwater runoff. Additionally, all <br />future development consistent with the Housing Element Update would be <br />evaluated on a project-by-project basis to ensure that there are no <br />significant impacts related to surface runoff and flooding. Further, new
The URL can be used to link to this page
Your browser does not support the video tag.