My WebLink
|
Help
|
About
|
Sign Out
Planning Commission meeting agenda packet 7-9-25
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
07-09
>
Planning Commission meeting agenda packet 7-9-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:39:07 PM
Creation date
12/30/2025 3:30:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1025
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRA <br />F <br />T <br /> <br /> <br /> <br />P25-0227 PC-2025-13, July 9, 2025 <br /> <br />16. BUILDING PERMIT: Any tenant improvement plans shall be submitted to the Building <br />and Safety Division for review and approval prior to operation. The applicant shall obtain <br />a building permit prior to commencement of any work. <br /> <br />17. SIGN PROGRAM: Site and building signage shall be reviewed under a comprehensive <br />sign program submitted to the Planning Division under a separate application. <br /> <br />Fees <br /> <br />18. FEES: The applicant shall pay any and all fees to which the property may be subject, <br />prior to issuance of grading and/or building permits, or prior to recordation of the final <br />map, whichever is applicable. The type and amount of the fees shall be those in effect <br />at the time the permit is issued. <br /> <br />19. WATER FEES AND WATER METER CONNECTION FEES: The applicant shall pay the <br />applicable Zone 7 and City connection fees and water meter cost for any water meters <br />and irrigation meters, if applicable, prior to building permit issuance. <br /> <br />20. SEWER FEES: The applicant shall pay the applicable Dublin-San Ramon Services <br />District (DSRSD) and City sewer permit fees prior to building permit issuance. <br /> <br />21. SCHOOL IMPACT FEES – COMMERCIAL: Prior to building permit issuance, the <br />applicant shall pay the required commercial development school impact fee as <br />prescribed by State law and as adopted by the Pleasanton Unified School District <br />(PUSD). <br /> <br />TRAFFIC ENGINEERING DIVISION – 925-931-5677 <br /> <br />22. PARKING MONITORING. Monitoring of circulation and parking during operational hours <br />may be conducted by Traffic Engineering staff. If parking exceeds the allowed allotment <br />and/or circulation problems arise once the fitness facility is in operation, as determined <br />by the City’s Traffic Engineer, this Conditional Use Permit may be submitted to the <br />Planning Commission for their subsequent review at a public hearing. If necessary, the <br />Planning Commission may modify or add conditions of approval to mitigate such <br />impacts or may revoke said Conditional Use Permit. (Project Specific Condition) <br /> <br />23. Based on the Approved Plans, no traffic impact fees are required at this time. However, <br />Traffic Engineering may monitor the site throughout the Conditional Use Permit, as <br />warranted. Should Traffic Engineering observe additional trips during its observations in <br />the PM peak hours, the City Traffic Engineer shall require the applicant to pay for a trip <br />generation "after study" to be completed by the City's on -call transportation consultant. <br />If the trip generation “after study” is reflective of the Approved Plans, no further action <br />shall be needed. If the trip generation is greater than the Approved Plans, the applicant <br />shall be required to pay the City’s Traffic Impact Fees associated with the additional <br />trips and/or have their Conditional Use Permit brought back to the Planning Commission <br />for subsequent review. (Project Specific Condition) <br /><End>
The URL can be used to link to this page
Your browser does not support the video tag.