Laserfiche WebLink
<br />Page 26 <br /> <br />Any alterations to pedestrian paths of travel must conform to current standards for the <br />disabled. Any walking member of the public with a visual impairment (cane or guide dog) <br />must be escorted through the construction zone. <br />(Address this condition during construction) <br /> <br />108. HIGH VISIBILITY SAFETY APPAREL: All workers on foot who are exposed to the hazard of <br />vehicular traffic shall wear warning garments such as vests, jackets, or shirts manufactured in <br />accordance with the requirements of the American National Standards Institute <br />(ANSI)/International Safety Equipment Association (ISEA) 107-2004 Performance Class 2, <br />high visibility safety apparel and headwear, or any updates adopted by Cal OSHA. During <br />hours of darkness, warning garments shall be retroreflective with visibility from a minimum <br />1,000 feet. (Address this condition during construction) <br /> <br />109. EXCAVATION SAFETY: All excavations must be performed in conformance with California <br />Government Code Section 4216 et seq. No excavation shall occur until proper notice is <br />provided to Underground Service Alert (usanorth811.org) by calling either 811 or 800-642- <br />2444 at least 72 hours prior to the work so buried utilities can be marked. All excavations shall <br />be covered or barricaded to prevent entry when work is inactive. Open excavations in the <br />public right-of-way must be covered by skid-resistant steel plates that are firmly affixed to the <br />surface with leading edges ramped. Excavations 5-feet and deeper require a protective <br />system as defined by Cal-OSHA. If a shoring system or trench boxes will be utilized as the <br />protective system, said system shall either be manufactured and installed according to <br />manufacturer recommendations, or designed by a registered professional engineer and <br />installed according to approved plans. No excavation shall be performed atop or adjacent to a <br />high-risk facility until authorized by the owner of the facility. High-risk facilities are defined as <br />gas transmission pipelines and hazardous liquid pipelines as regulated by the U.S. <br />Department of Transportation Pipeline and Hazardous Materials Safety Administration (US <br />DOT PHMSA) (Address this condition during construction) <br /> <br />110. POLLUTANT REDUCTION IN STORMWATER: At no time during construction of the project <br />shall pollutants be allowed to enter, clog, or contaminate storm drain pipe networks or open <br />stormwater channels in violation of Pleasanton Municipal Code §9.14.080 et seq. The <br />applicant shall contain all trash and debris for proper disposal to authorized landfills or <br />recyclers. Erosion control features shall be deployed during the rainy season that extends <br />from October 1st to April 15th each year, or any time rain is forecast outside of this period. <br />Best Management Practices (BMPs) shall be strictly followed. Street sweepers must be <br />employed if soil or debris is tracked onto the public roads from vehicles exiting the site. <br />Standard BMPs are available from the California Stormwater Quality Association (CASQA), <br />the United States Environmental Protection Agency (EPA), Caltrans, and others. Notes and/or <br />illustrations shall be added to the plans that describe the BMPs to be utilized during <br />construction. The use of manufactured erosion control woven blankets and straw wattles that <br />utilize plastic monofilament netting is specifically prohibited. (Address this condition during <br />construction) <br /> <br />111. SWPPP REPORTING: Copies of any monitoring and/or sampling reports required by the <br />stormwater pollution prevention plan (SWPPP) and submitted by the Legally Responsible <br />Person (LRP) to the State of California’s SMARTS database shall also be submitted to the